Wall and ceiling contractorsNAICS 238310 · SIC 1742

Wall and ceiling contractors frame with metal studs, hang and finish gypsum board, plaster, apply stucco and spray fireproofing, and install suspended ceilings, mostly as subcontractors on new buildings and fit-outs. The work is heavy, repetitive and done from stilts and scaffolds, and exterior stucco adds long-tail water intrusion claims.

NAICS 238310 Drywall and Insulation ContractorsSIC 1742 Plastering, Drywall, Acoustical, and Insulation WorkNAICS 238140 Masonry Contractors

Construction · Updated November 2026

01 / Loss drivers

Where losses come from.

  1. 01

    Back, shoulder and knee injuries from lifting board, plus falls from stilts and scaffolds

  2. 02

    Water entering behind stucco and exterior finish systems years after completion

  3. 03

    Fire-rated walls and ceilings built wrong and discovered after a fire or inspection

How it comparesEach line’s rating against the average for its NAICS sector, Construction (49 business types), and for all 747.
  1. PropertyProperty: Moderate, 2 of 5; sector average 2.2; all business types 2.9.
  2. Business interruptionBusiness interruption: Low, 1 of 5; sector average 1.8; all business types 2.7.
  3. Premises liabilityPremises liability: Elevated, 3 of 5; sector average 3.5; all business types 2.7.
  4. Products and completed workProducts and completed work: Elevated, 3 of 5; sector average 3.8; all business types 2.6.
  5. Workers’ injuryWorkers’ injury: High, 4 of 5; sector average 3.8; all business types 3.0.
  6. Commercial autoCommercial auto: Moderate, 2 of 5; sector average 3.1; all business types 2.5.
  7. Crime and theftCrime and theft: Low, 1 of 5; sector average 1.7; all business types 2.2.
  8. Inland marine and equipmentInland marine and equipment: Elevated, 3 of 5; sector average 3.2; all business types 2.6.
  9. EnvironmentalEnvironmental: Moderate, 2 of 5; sector average 2.5; all business types 2.3.
  10. Cyber and dataCyber and data: Moderate, 2 of 5; sector average 2.0; all business types 2.7.
  11. Professional liabilityProfessional liability: Moderate, 2 of 5; sector average 2.3; all business types 2.0.
  12. Umbrella and excessUmbrella and excess: High, 4 of 5; sector average 4.0; all business types 3.6.
What’s changing
  • Prefabricated wall panels and robotic finishing move more work into factories, cutting on-site strain injuries but concentrating defects across many units.
  • Scrutiny of combustible exterior cladding after high-rise fires raises the stakes on exterior foam systems and on firestopping between floors.
  • Labor shortages push more work to piece-rate crews and labor brokers, which raises uninsured-subcontractor and injury exposure.
02 / Line by line

Twelve lines, rated.

Each line shows its rating and the reason for it; open a line for what to watch for and the controls that matter. Ratings are UrbanStat’s own editorial view of a typical business of this type, on a five-step scale. They are a starting point for questions, not a quote, a rate or a statistical measure.

Property

Moderate
Board, steel studs and bagged plaster barely burn; the yard stores scaffolding, lifts and sprayers.

Fire, explosion, water and weather damage to buildings, contents and stock.

Watch for
  • Foam insulation board for exterior finish systems stored in bulk
  • Adhesives and primers kept with general stock
Controls that matter
  • Foam board stock limited and kept from ignition sources
  • Flammable liquids in a rated cabinet

Business interruption

Low
Suppliers deliver board straight to each floor, so the firm's own premises contribute little to earning.

How long and how costly a shutdown is.

Watch for
  • A handful of general contractors providing nearly all work
Controls that matter
  • Estimating and project records backed up off site

Premises liability

Elevated
Crews share busy sites with other trades and the public, with stocked floors, dust, exterior scaffolds and powder-actuated tools.

Injuries to customers and the public, on site or caused by operations elsewhere.

Watch for
  • Board stacked on floors beyond their load capacity
  • Exterior stucco scaffolds over sidewalks and neighboring property
  • Sanding dust entering occupied areas and air systems during fit-outs
Controls that matter
  • Board deliveries spread across the floor as the engineer allows
  • Netted, tied scaffolds with overhead protection
  • Dust barriers and vacuum sanders in occupied buildings

Products and completed work

Elevated
Stucco and exterior finish systems leak at windows and joints, and errors in rated assemblies or ceiling hangers stay hidden until tested.

Harm caused by what the business sells, serves, makes, installs or repairs.

Watch for
  • Exterior insulation and finish systems or stucco on wood-framed housing
  • Shaft walls, firestopping and rated ceilings installed without inspection
  • Heavy ceilings or soffits hung from light wire in earthquake areas
Controls that matter
  • Rated assemblies built to the tested design, with photos before close-up
  • Drainage-type exterior systems installed by manufacturer-trained applicators
  • Seismic bracing and hanger spacing checked against drawings

Workers’ injury

High
Hangers lift heavy sheets overhead all day and finishers walk on stilts; strains, falls and eye injuries are constant.

Injuries and illness to employees.

Watch for
  • Large sheets carried and lifted by one person
  • Stilts used on cluttered floors or near openings
  • Piece-rate pay and labor brokers supplying crews
Controls that matter
  • Board lifts, carts and two-person handling for ceilings
  • Rolling scaffolds or benches where floors are not clear
  • All workers on the firm's or an insured subcontractor's payroll

Commercial auto

Moderate
Crews drive to one site for weeks at a time and materials arrive by supplier truck.

Owned, hired and employee-driven vehicles, deliveries, customers’ vehicles in care.

Watch for
  • Company trucks hauling scaffolding or towing texture sprayers
  • Workers transported in crew vans over long distances
Controls that matter
  • Approved driver list with record checks
  • Hired and non-owned auto cover for employees' vehicles

Crime and theft

Low
Payment comes through progress billing and materials are cheap and bulky.

Burglary, robbery, employee dishonesty, cash, payment and invoice fraud.

Watch for
  • Payroll padded with ghost workers on large crews
Controls that matter
  • Site headcounts reconciled to payroll by someone independent

Inland marine and equipment

Elevated
Scaffolding, lifts, plaster pumps, texture sprayers and screw guns stay on sites for the length of each job.

Property in transit, at job sites or in the insured’s care, and mobile equipment.

Watch for
  • Scaffold erected on exterior walls for months
  • Tools left in gang boxes on open sites
Controls that matter
  • Scaffold and equipment schedule kept current
  • Locked storage and marked tools

Environmental

Moderate
Renovation disturbs asbestos in old plaster and texture coats, and board closed in wet grows mold behind finished walls.

Pollution on or from the site or the work.

Watch for
  • Demolition of textured ceilings or plaster in older buildings
  • Board hung before the building is weathertight, or after a site leak
Controls that matter
  • Asbestos survey before tear-out; licensed removal where positive
  • Moisture checks on board and framing before finishing

Cyber and data

Moderate
Estimating, payroll for large crews and contractor bid portals run online; ransomware stalls bids and pay runs more than it exposes customers.

Data breaches, ransomware, system outages and attacks on connected equipment.

Watch for
  • Workers' identity and bank details held in spreadsheets or shared folders
  • Payment instructions changed by email without a call-back check
Controls that matter
  • Payroll in a hosted system with multi-factor login
  • Call-back verification before any change to payment details

Professional liability

Moderate
Delegated design of light-gauge framing, rated assemblies and seismic bracing puts the firm's engineering choices behind walls and ceilings.

Loss or injury caused by advice, design, testing, care or another professional service.

Watch for
  • Delegated framing or bracing design accepted without an engineer of record
  • Substitutions of rated assemblies proposed by the firm
Controls that matter
  • Licensed engineer's stamped submittals for any delegated design
  • Substitutions approved in writing by the designer before installation

Umbrella and excess

High
Stucco defects repeated across a condominium or tract, or a heavy ceiling falling on an audience, produce very large claims.

How likely one liability event is to exhaust primary limits.

Watch for
  • Condominium, apartment or tract work with repeated exterior details
  • Plaster or suspended ceilings over theaters, arenas and lobbies
Controls that matter
  • Wrap-up or project-specific limits checked against the firm's own
  • Third-party inspection of exterior water details on large housing projects
03 / Property picture

Construction, occupancy, protection, exposure.

What a risk engineer expects to find at a typical site of this type, and what to compare a submission against.

Construction
A modest office with a yard or warehouse for scaffolding, lifts and sprayers; board is delivered straight to job sites rather than stocked.
Occupancy
Storage of steel studs, some board, bagged plaster, adhesives and foam board for exterior systems, plus battery charging for lifts and tools.
Protection
Flammable liquids in rated cabinets, foam board stock limited and kept away from charging areas, monitored alarms and a fenced, lit yard.
Exposure
The premises add little; job sites put scaffolds over sidewalks and heavy board stacks on floors shared with other trades, and exterior foam systems can carry fire up a facade.
04 / Checklist

What to ask and look for.

Start with the desk review before quoting, then walk the site. Tick questions off as you go; ticks are kept in this browser only.

Before quoting: ask the broker or owner

Documents to request

On site: work performed

On site: job sites

On site: equipment and vehicles

On site: records and history

Refer or decline if you find

  • Uninsured labor brokers supplying the crews
  • Stucco or exterior finish systems on tract housing with no drainage details
  • Fire-rated assemblies built without inspection or photos
  • Stilts used near floor openings or on stairs
  • Old textured ceilings removed without asbestos testing
05 / Location

How UrbanStat data helps.

Finished work shows the location: earthquakes crack partitions and drop poorly braced ceilings, wind-driven rain tests stucco, and floods ruin gypsum board on site before it is hung. Tools and scaffolds left on sites are stolen.

EarthquakeHurricaneWindFloodCrime
  • Earthquake scores at project addresses show where ceiling bracing and partition detailing carry real completed-work exposure.
  • Hurricane and wind scores at the address indicate where exterior stucco and finish systems face wind-driven rain.
  • Flood scores for a job site flag where board and materials stocked on lower floors could be lost before installation.
Earthquake · Hurricane · Wind · Flood
06 / Public loss data · NAICS 238310

What the published numbers say.

Official statistics for the industry or property type closest to this business. They describe the industry as a whole, not any one insured.

Workers’ injury frequency

2.9 recordable injuries and illnesses per 100 full-time workers, above the private-industry average of 2.3.

Drywall and insulation contractors
2.9
All private industry
2.3

1.2 of these cases per 100 workers involved days away from work.

United States, 2024. Industry: Drywall and insulation contractors (NAICS 23831), the closest published group. Source: U.S. Bureau of Labor Statistics, Survey of Occupational Injuries and Illnesses, Table 1: incidence rates of nonfatal occupational injuries and illnesses by industry and case types, 2024.

Workplace deaths

17 fatal work injuries in 2024, most often from falls, slips and trips (10).

Construction
9.2
All workers
3.3

Deaths per 100,000 full-time equivalent workers, for the industry sector as a whole.

United States, private industry, 2024. Industry: Drywall and Insulation Contractors (NAICS 23831), the closest published group. Source: U.S. Bureau of Labor Statistics, Census of Fatal Occupational Injuries; sector rates.

Most cited safety standards

874 citations from 317 inspections; 57% were classed serious, willful or repeat.

  • 1926.451 General requirements (scaffolds)
    72
  • 1926.501 Duty to have fall protection
    58
  • 1910.134 Respiratory protection
    50
  • 1910.1200 Hazard communication
    31
  • 1926.1053 Ladders
    30

Standards cited most often in this industry, by number of citations.

United States, citations issued October 2024 to September 2025 (federal fiscal year 2025). Industry: Drywall and Insulation Contractors (NAICS 238310). Covers federal and state-plan inspections. A citation is one violation item; one inspection can produce several. Source: U.S. Department of Labor, Occupational Safety and Health Administration, OSHA enforcement data (inspections and violations); standard titles from the Code of Federal Regulations, Title 29 (section headings).

Industry loss ratios by line2020 to 2024, the same table on every guide

Loss ratios are published by line of insurance, not by business type. They show how each line has run for insurers as a whole, whatever the business insured.

Published lineClosest line in this guide20202021202220232024
FireProperty63.2%67.3%62.4%45.5%40.9%
Commercial multiple perilProperty and liability sold as a package61.2%60.2%59.4%61.2%54.4%
Inland marineInland marine and equipment64.5%49.4%47.1%44.1%44.0%
Other liabilityPremises liability, and most umbrella, professional (other than medical) and cyber cover65.1%58.8%61.0%63.7%71.2%
Products liabilityProducts and completed work48.2%52.2%46.0%57.5%60.3%
Workers’ compensationWorkers’ injury47.9%49.2%45.0%44.3%46.0%
Commercial auto liabilityCommercial auto68.3%66.5%71.9%76.8%77.6%
Commercial auto physical damageCommercial auto50.9%56.3%64.3%65.1%57.9%

United States. Losses incurred as a percent of direct premiums earned, countrywide, before reinsurance and not including loss adjustment expense. Source: National Association of Insurance Commissioners, Report on Profitability by Line by State in 2024, ten-year summary.

Coverages to raise
Contractors' pollution liability
Asbestos in old plaster and mold behind closed-in board are pollution claims general liability often excludes.
Installation floater
Board, studs and ceiling grid delivered to the site are the firm's risk until the work is accepted.
Employment practices
Large, changing crews, piece-rate pay and labor brokers bring wage, classification and discrimination claims.
Rented equipment
Scissor lifts, boom lifts and rolling scaffolds rented per job must be insured as the rental contract requires.

NAICS and SIC codes for wall and ceiling contractors

SystemCodeIndustry
NAICS 2022, primary238310Drywall and Insulation Contractors
NAICS 2022238140Masonry Contractors
SIC 1987, primary1742Plastering, Drywall, Acoustical, and Insulation Work
Next step

See this risk on the map.

Book a 30-minute walkthrough tailored to your portfolio and perils of interest.

Request a Demo →