Tile and marble contractorsNAICS 238340 · SIC 1743

Tile and stone setters waterproof and finish showers, floors, kitchens and building facades in ceramic, porcelain and natural stone, and some also cut and polish countertop slabs in their own shops. Most claims come from water getting behind tile in wet areas, and from dust, kneeling and heavy slabs.

NAICS 238340 Tile and Terrazzo ContractorsSIC 1743 Terrazzo, Tile, Marble, and Mosaic WorkNAICS 238140 Masonry Contractors+1 more code

Construction · Updated November 2026

01 / Loss drivers

Where losses come from.

  1. 01

    Leaking showers and wet rooms that rot framing and grow mold after completion

  2. 02

    Silica dust, knee and back injuries, and slabs crushing workers

  3. 03

    Slip injuries on finished floors and stone or tile detaching from walls

How it comparesEach line’s rating against the average for its NAICS sector, Construction (49 business types), and for all 747.
  1. PropertyProperty: Moderate, 2 of 5; sector average 2.2; all business types 2.9.
  2. Business interruptionBusiness interruption: Low, 1 of 5; sector average 1.8; all business types 2.7.
  3. Premises liabilityPremises liability: Elevated, 3 of 5; sector average 3.5; all business types 2.7.
  4. Products and completed workProducts and completed work: High, 4 of 5; sector average 3.8; all business types 2.6.
  5. Workers’ injuryWorkers’ injury: High, 4 of 5; sector average 3.8; all business types 3.0.
  6. Commercial autoCommercial auto: Elevated, 3 of 5; sector average 3.1; all business types 2.5.
  7. Crime and theftCrime and theft: Low, 1 of 5; sector average 1.7; all business types 2.2.
  8. Inland marine and equipmentInland marine and equipment: Moderate, 2 of 5; sector average 3.2; all business types 2.6.
  9. EnvironmentalEnvironmental: Moderate, 2 of 5; sector average 2.5; all business types 2.3.
  10. Cyber and dataCyber and data: Moderate, 2 of 5; sector average 2.0; all business types 2.7.
  11. Professional liabilityProfessional liability: Low, 1 of 5; sector average 2.3; all business types 2.0.
  12. Umbrella and excessUmbrella and excess: Elevated, 3 of 5; sector average 4.0; all business types 3.6.
What’s changing
  • Silica disease among workers cutting engineered stone has brought tighter dust rules and growing injury claims, pushing the trade toward wet cutting and lower-silica materials.
  • Large-format porcelain panels and curbless showers demand flatter substrates and better waterproofing, so installation errors show up as cracks and leaks.
  • Smart leak sensors installed under showers and vanities can catch hidden leaks early, reducing the size of completed-work water claims.
02 / Line by line

Twelve lines, rated.

Each line shows its rating and the reason for it; open a line for what to watch for and the controls that matter. Ratings are UrbanStat’s own editorial view of a typical business of this type, on a five-step scale. They are a starting point for questions, not a quote, a rate or a statistical measure.

Property

Moderate
Stone and tile stock does not burn but breaks; the shop adds saws, polishers, packaging and resin adhesives.

Fire, explosion, water and weather damage to buildings, contents and stock.

Watch for
  • Slab racks that can topple in a domino effect
  • Epoxy resins and solvents stored in the shop
Controls that matter
  • Engineered A-frame racks with restraint bars
  • Flammable resins and sealers kept in a rated cabinet

Business interruption

Low
Installers restart with hand tools and a wet saw; shops with one bridge saw are the exception.

How long and how costly a shutdown is.

Watch for
  • Single cutting machine fabricating all countertop orders
Controls that matter
  • Arrangement with another fabricator for overflow cutting

Premises liability

Elevated
Work in occupied homes and open commercial spaces leaves wet floors, dust, uneven thresholds and disturbed plumbing fixtures.

Injuries to customers and the public, on site or caused by operations elsewhere.

Watch for
  • Toilets, valves and supply lines removed and refitted by tile setters
  • Work in shops, lobbies or malls during trading hours
  • Dust spread through occupied buildings
Controls that matter
  • Licensed plumber for fixture removal and reconnection
  • Barriers and signage around wet or uncured floors
  • Dust containment with vacuum-attached tools

Products and completed work

High
A missed membrane seam or unsealed niche leaks unseen for months, the trade's most common claim; loose or slick tile injures people later.

Harm caused by what the business sells, serves, makes, installs or repairs.

Watch for
  • Curbless showers, steam rooms and exterior decks over living space
  • Stone cladding or large-format tile hung on walls and facades
  • Polished stone specified for wet entrances
Controls that matter
  • Flood test of every shower pan before tile is set
  • Membrane systems installed by trained, manufacturer-approved setters
  • Slip-resistance ratings confirmed for floor tile in wet areas

Workers’ injury

High
Setters kneel for years, cut silica-rich material, and move slabs heavy enough to kill if a rack or clamp fails.

Injuries and illness to employees.

Watch for
  • Engineered stone cut or polished dry
  • Slabs unloaded by hand without clamps or cranes
  • Kneeling work without knee protection or rotation
Controls that matter
  • Wet cutting and local exhaust, with air monitoring in the shop
  • Slab clamps, vacuum lifters and trained handling crews
  • Knee pads, kneeling boards and task rotation

Commercial auto

Elevated
Vans and flatbeds carry tile, mortar and slabs to job sites daily.

Owned, hired and employee-driven vehicles, deliveries, customers’ vehicles in care.

Watch for
  • Slabs carried on improvised racks
  • Overloaded vans with pallets of tile
Controls that matter
  • Purpose-built A-frames and straps for slab transport
  • Driving record checks for installers

Crime and theft

Low
Stock is heavy and hard to resell; little cash is handled.

Burglary, robbery, employee dishonesty, cash, payment and invoice fraud.

Watch for
  • Tools and saws left in vans overnight
Controls that matter
  • Locked vehicles and marked equipment

Inland marine and equipment

Moderate
Tools travel daily, and fragile stone slabs and custom tile can break in transit or before fixing.

Property in transit, at job sites or in the insured’s care, and mobile equipment.

Watch for
  • Rare or book-matched slabs that cannot be replaced
Controls that matter
  • Transit and installation cover for high-value stone orders

Environmental

Moderate
Silica slurry and dust, sealers and epoxy residues are the wastes; demolition can disturb asbestos in old flooring and adhesive.

Pollution on or from the site or the work.

Watch for
  • Old vinyl tile or mastic removed without testing
  • Saw slurry discharged to drains
Controls that matter
  • Testing before tear-out and settled slurry disposed of as solid waste

Cyber and data

Moderate
Showroom sales, design software and card payments hold homeowners' details, and a ransomware hit stalls quoting and scheduling.

Data breaches, ransomware, system outages and attacks on connected equipment.

Watch for
  • Cutting machines and design files on the same network as office email
  • Deposits taken by card over the phone
Controls that matter
  • Shop machines on a separate network segment with backups of cut files
  • Hosted payment links or tokenized card readers for deposits

Professional liability

Low
Layout and tile selection advice comes with the installation; failures are workmanship claims under completed work rather than professional errors.

Loss or injury caused by advice, design, testing, care or another professional service.

Watch for
  • Showroom design services billed separately from installation
Controls that matter
  • Design and selection responsibility stated in the sales contract

Umbrella and excess

Elevated
Stone cladding falling from a facade, or leaks repeated across a condominium's showers, can run past primary limits.

How likely one liability event is to exhaust primary limits.

Watch for
  • Exterior stone or tile on mid- and high-rise facades
  • Multifamily projects with the same shower detail in every unit
Controls that matter
  • Engineered anchoring and inspections for all exterior cladding
  • Flood tests documented unit by unit on multifamily jobs
03 / Property picture

Construction, occupancy, protection, exposure.

What a risk engineer expects to find at a typical site of this type, and what to compare a submission against.

Construction
A showroom and warehouse or fabrication shop, often a single-story masonry or metal building, with slab racks indoors and a yard for deliveries.
Occupancy
Stone and tile stock barely burns, but packaging, pallets, resins, sealers and epoxy adhesives add fuel, and wet saws and polishers draw heavy power.
Protection
Rated cabinets for resins and sealers, cardboard and pallets cleared regularly, restrained slab racks, monitored alarms, and ground-fault protection on wet cutting equipment.
Exposure
Showrooms often share walls in retail strips; on jobs, a failed shower in an upper-floor unit leaks into the homes and shops below.
04 / Checklist

What to ask and look for.

Start with the desk review before quoting, then walk the site. Tick questions off as you go; ticks are kept in this browser only.

Before quoting: ask the broker or owner

Documents to request

On site: work performed

On site: installation practice

On site: shop and handling

On site: records and history

Refer or decline if you find

  • Dry cutting of engineered stone
  • Showers tiled with no membrane or flood test
  • Slabs stored leaning against walls without racks
  • Tile setters reconnecting plumbing
  • Exterior stone cladding with no engineered anchoring
05 / Location

How UrbanStat data helps.

Slab racks and brittle stone stock are vulnerable to earthquake shaking, and a shop at ground level floods easily. Exterior stone and tile cladding must hold through wind and seismic movement at each job address.

EarthquakeFloodWind
  • Earthquake scores at the shop address show how exposed racked stone slabs are to toppling and breakage.
  • Parcel and permit data give a building's construction date, a quick screen for asbestos flooring and old plumbing before tear-out and retiling.
  • Flood scores at the address show whether a ground-level showroom, saws and stored materials sit in water's path.
Earthquake · Flood · Wind
06 / Public loss data · NAICS 238340

What the published numbers say.

Official statistics for the industry or property type closest to this business. They describe the industry as a whole, not any one insured.

Workers’ injury frequency

2.4 recordable injuries and illnesses per 100 full-time workers, close to the private-industry average of 2.3.

Tile and terrazzo contractors
2.4
All private industry
2.3

1.2 of these cases per 100 workers involved days away from work.

United States, 2024. Industry: Tile and terrazzo contractors (NAICS 23834), the closest published group. Source: U.S. Bureau of Labor Statistics, Survey of Occupational Injuries and Illnesses, Table 1: incidence rates of nonfatal occupational injuries and illnesses by industry and case types, 2024.

Workplace deaths

89 fatal work injuries in 2024, most often from falls, slips and trips (39).

Construction
9.2
All workers
3.3

Deaths per 100,000 full-time equivalent workers, for the industry sector as a whole.

United States, private industry, 2024. Industry: Building Finishing Contractors (NAICS 2383), the closest published group. Source: U.S. Bureau of Labor Statistics, Census of Fatal Occupational Injuries; sector rates.

Most cited safety standards

120 citations from 38 inspections; 49% were classed serious, willful or repeat.

  • 1910.1200 Hazard communication
    8
  • 1926.501 Duty to have fall protection
    6
  • 1926.416 General requirements (electrical)
    4
  • 1926.50 Medical services and first aid
    4
  • 1910.134 Respiratory protection
    4

Standards cited most often in this industry, by number of citations.

United States, citations issued October 2024 to September 2025 (federal fiscal year 2025). Industry: Tile and Terrazzo Contractors (NAICS 238340). Covers federal and state-plan inspections. A citation is one violation item; one inspection can produce several. Source: U.S. Department of Labor, Occupational Safety and Health Administration, OSHA enforcement data (inspections and violations); standard titles from the Code of Federal Regulations, Title 29 (section headings).

Industry loss ratios by line2020 to 2024, the same table on every guide

Loss ratios are published by line of insurance, not by business type. They show how each line has run for insurers as a whole, whatever the business insured.

Published lineClosest line in this guide20202021202220232024
FireProperty63.2%67.3%62.4%45.5%40.9%
Commercial multiple perilProperty and liability sold as a package61.2%60.2%59.4%61.2%54.4%
Inland marineInland marine and equipment64.5%49.4%47.1%44.1%44.0%
Other liabilityPremises liability, and most umbrella, professional (other than medical) and cyber cover65.1%58.8%61.0%63.7%71.2%
Products liabilityProducts and completed work48.2%52.2%46.0%57.5%60.3%
Workers’ compensationWorkers’ injury47.9%49.2%45.0%44.3%46.0%
Commercial auto liabilityCommercial auto68.3%66.5%71.9%76.8%77.6%
Commercial auto physical damageCommercial auto50.9%56.3%64.3%65.1%57.9%

United States. Losses incurred as a percent of direct premiums earned, countrywide, before reinsurance and not including loss adjustment expense. Source: National Association of Insurance Commissioners, Report on Profitability by Line by State in 2024, ten-year summary.

Coverages to raise
Installation floater
Costly or irreplaceable stone delivered to a job is the firm's risk until it is set and accepted.
Contractors' pollution liability
Old asbestos flooring and mastic disturbed during tear-out, and mold from leaking showers, fall outside general liability.
Ocean cargo and transit
Stone the firm imports directly travels by sea and road at its own risk, and slabs crack in containers.

NAICS and SIC codes for tile and marble contractors

SystemCodeIndustry
NAICS 2022, primary238340Tile and Terrazzo Contractors
NAICS 2022238140Masonry Contractors
SIC 1987, primary1743Terrazzo, Tile, Marble, and Mosaic Work
SIC 19871741Masonry, Stone Setting, and Other Stone Work
Next step

See this risk on the map.

Book a 30-minute walkthrough tailored to your portfolio and perils of interest.

Request a Demo →