Tile and marble contractorsNAICS 238340 · SIC 1743
Tile and stone setters waterproof and finish showers, floors, kitchens and building facades in ceramic, porcelain and natural stone, and some also cut and polish countertop slabs in their own shops. Most claims come from water getting behind tile in wet areas, and from dust, kneeling and heavy slabs.
NAICS 238340 Tile and Terrazzo ContractorsSIC 1743 Terrazzo, Tile, Marble, and Mosaic WorkNAICS 238140 Masonry Contractors+1 more code
Where losses come from.
- 01
Leaking showers and wet rooms that rot framing and grow mold after completion
- 02
Silica dust, knee and back injuries, and slabs crushing workers
- 03
Slip injuries on finished floors and stone or tile detaching from walls
- PropertyProperty: Moderate, 2 of 5; sector average 2.2; all business types 2.9.
- Business interruptionBusiness interruption: Low, 1 of 5; sector average 1.8; all business types 2.7.
- Premises liabilityPremises liability: Elevated, 3 of 5; sector average 3.5; all business types 2.7.
- Products and completed workProducts and completed work: High, 4 of 5; sector average 3.8; all business types 2.6.
- Workers’ injuryWorkers’ injury: High, 4 of 5; sector average 3.8; all business types 3.0.
- Commercial autoCommercial auto: Elevated, 3 of 5; sector average 3.1; all business types 2.5.
- Crime and theftCrime and theft: Low, 1 of 5; sector average 1.7; all business types 2.2.
- Inland marine and equipmentInland marine and equipment: Moderate, 2 of 5; sector average 3.2; all business types 2.6.
- EnvironmentalEnvironmental: Moderate, 2 of 5; sector average 2.5; all business types 2.3.
- Cyber and dataCyber and data: Moderate, 2 of 5; sector average 2.0; all business types 2.7.
- Professional liabilityProfessional liability: Low, 1 of 5; sector average 2.3; all business types 2.0.
- Umbrella and excessUmbrella and excess: Elevated, 3 of 5; sector average 4.0; all business types 3.6.
- Silica disease among workers cutting engineered stone has brought tighter dust rules and growing injury claims, pushing the trade toward wet cutting and lower-silica materials.
- Large-format porcelain panels and curbless showers demand flatter substrates and better waterproofing, so installation errors show up as cracks and leaks.
- Smart leak sensors installed under showers and vanities can catch hidden leaks early, reducing the size of completed-work water claims.
Twelve lines, rated.
Each line shows its rating and the reason for it; open a line for what to watch for and the controls that matter. Ratings are UrbanStat’s own editorial view of a typical business of this type, on a five-step scale. They are a starting point for questions, not a quote, a rate or a statistical measure.
Property
ModerateStone and tile stock does not burn but breaks; the shop adds saws, polishers, packaging and resin adhesives.
Fire, explosion, water and weather damage to buildings, contents and stock.
- Slab racks that can topple in a domino effect
- Epoxy resins and solvents stored in the shop
- Engineered A-frame racks with restraint bars
- Flammable resins and sealers kept in a rated cabinet
Business interruption
LowInstallers restart with hand tools and a wet saw; shops with one bridge saw are the exception.
How long and how costly a shutdown is.
- Single cutting machine fabricating all countertop orders
- Arrangement with another fabricator for overflow cutting
Premises liability
ElevatedWork in occupied homes and open commercial spaces leaves wet floors, dust, uneven thresholds and disturbed plumbing fixtures.
Injuries to customers and the public, on site or caused by operations elsewhere.
- Toilets, valves and supply lines removed and refitted by tile setters
- Work in shops, lobbies or malls during trading hours
- Dust spread through occupied buildings
- Licensed plumber for fixture removal and reconnection
- Barriers and signage around wet or uncured floors
- Dust containment with vacuum-attached tools
Products and completed work
HighA missed membrane seam or unsealed niche leaks unseen for months, the trade's most common claim; loose or slick tile injures people later.
Harm caused by what the business sells, serves, makes, installs or repairs.
- Curbless showers, steam rooms and exterior decks over living space
- Stone cladding or large-format tile hung on walls and facades
- Polished stone specified for wet entrances
- Flood test of every shower pan before tile is set
- Membrane systems installed by trained, manufacturer-approved setters
- Slip-resistance ratings confirmed for floor tile in wet areas
Workers’ injury
HighSetters kneel for years, cut silica-rich material, and move slabs heavy enough to kill if a rack or clamp fails.
Injuries and illness to employees.
- Engineered stone cut or polished dry
- Slabs unloaded by hand without clamps or cranes
- Kneeling work without knee protection or rotation
- Wet cutting and local exhaust, with air monitoring in the shop
- Slab clamps, vacuum lifters and trained handling crews
- Knee pads, kneeling boards and task rotation
Commercial auto
ElevatedVans and flatbeds carry tile, mortar and slabs to job sites daily.
Owned, hired and employee-driven vehicles, deliveries, customers’ vehicles in care.
- Slabs carried on improvised racks
- Overloaded vans with pallets of tile
- Purpose-built A-frames and straps for slab transport
- Driving record checks for installers
Crime and theft
LowStock is heavy and hard to resell; little cash is handled.
Burglary, robbery, employee dishonesty, cash, payment and invoice fraud.
- Tools and saws left in vans overnight
- Locked vehicles and marked equipment
Inland marine and equipment
ModerateTools travel daily, and fragile stone slabs and custom tile can break in transit or before fixing.
Property in transit, at job sites or in the insured’s care, and mobile equipment.
- Rare or book-matched slabs that cannot be replaced
- Transit and installation cover for high-value stone orders
Environmental
ModerateSilica slurry and dust, sealers and epoxy residues are the wastes; demolition can disturb asbestos in old flooring and adhesive.
Pollution on or from the site or the work.
- Old vinyl tile or mastic removed without testing
- Saw slurry discharged to drains
- Testing before tear-out and settled slurry disposed of as solid waste
Cyber and data
ModerateShowroom sales, design software and card payments hold homeowners' details, and a ransomware hit stalls quoting and scheduling.
Data breaches, ransomware, system outages and attacks on connected equipment.
- Cutting machines and design files on the same network as office email
- Deposits taken by card over the phone
- Shop machines on a separate network segment with backups of cut files
- Hosted payment links or tokenized card readers for deposits
Professional liability
LowLayout and tile selection advice comes with the installation; failures are workmanship claims under completed work rather than professional errors.
Loss or injury caused by advice, design, testing, care or another professional service.
- Showroom design services billed separately from installation
- Design and selection responsibility stated in the sales contract
Umbrella and excess
ElevatedStone cladding falling from a facade, or leaks repeated across a condominium's showers, can run past primary limits.
How likely one liability event is to exhaust primary limits.
- Exterior stone or tile on mid- and high-rise facades
- Multifamily projects with the same shower detail in every unit
- Engineered anchoring and inspections for all exterior cladding
- Flood tests documented unit by unit on multifamily jobs
Construction, occupancy, protection, exposure.
What a risk engineer expects to find at a typical site of this type, and what to compare a submission against.
- Construction
- A showroom and warehouse or fabrication shop, often a single-story masonry or metal building, with slab racks indoors and a yard for deliveries.
- Occupancy
- Stone and tile stock barely burns, but packaging, pallets, resins, sealers and epoxy adhesives add fuel, and wet saws and polishers draw heavy power.
- Protection
- Rated cabinets for resins and sealers, cardboard and pallets cleared regularly, restrained slab racks, monitored alarms, and ground-fault protection on wet cutting equipment.
- Exposure
- Showrooms often share walls in retail strips; on jobs, a failed shower in an upper-floor unit leaks into the homes and shops below.
What to ask and look for.
Start with the desk review before quoting, then walk the site. Tick questions off as you go; ticks are kept in this browser only.
Before quoting: ask the broker or owner
Documents to request
On site: work performed
On site: installation practice
On site: shop and handling
On site: records and history
Refer or decline if you find
- Dry cutting of engineered stone
- Showers tiled with no membrane or flood test
- Slabs stored leaning against walls without racks
- Tile setters reconnecting plumbing
- Exterior stone cladding with no engineered anchoring
How UrbanStat data helps.
Slab racks and brittle stone stock are vulnerable to earthquake shaking, and a shop at ground level floods easily. Exterior stone and tile cladding must hold through wind and seismic movement at each job address.
- Earthquake scores at the shop address show how exposed racked stone slabs are to toppling and breakage.
- Parcel and permit data give a building's construction date, a quick screen for asbestos flooring and old plumbing before tear-out and retiling.
- Flood scores at the address show whether a ground-level showroom, saws and stored materials sit in water's path.
What the published numbers say.
Official statistics for the industry or property type closest to this business. They describe the industry as a whole, not any one insured.
2.4 recordable injuries and illnesses per 100 full-time workers, close to the private-industry average of 2.3.
1.2 of these cases per 100 workers involved days away from work.
United States, 2024. Industry: Tile and terrazzo contractors (NAICS 23834), the closest published group. Source: U.S. Bureau of Labor Statistics, Survey of Occupational Injuries and Illnesses, Table 1: incidence rates of nonfatal occupational injuries and illnesses by industry and case types, 2024.
89 fatal work injuries in 2024, most often from falls, slips and trips (39).
Deaths per 100,000 full-time equivalent workers, for the industry sector as a whole.
United States, private industry, 2024. Industry: Building Finishing Contractors (NAICS 2383), the closest published group. Source: U.S. Bureau of Labor Statistics, Census of Fatal Occupational Injuries; sector rates.
120 citations from 38 inspections; 49% were classed serious, willful or repeat.
- 1910.1200 Hazard communication8
- 1926.501 Duty to have fall protection6
- 1926.416 General requirements (electrical)4
- 1926.50 Medical services and first aid4
- 1910.134 Respiratory protection4
Standards cited most often in this industry, by number of citations.
United States, citations issued October 2024 to September 2025 (federal fiscal year 2025). Industry: Tile and Terrazzo Contractors (NAICS 238340). Covers federal and state-plan inspections. A citation is one violation item; one inspection can produce several. Source: U.S. Department of Labor, Occupational Safety and Health Administration, OSHA enforcement data (inspections and violations); standard titles from the Code of Federal Regulations, Title 29 (section headings).
Industry loss ratios by line2020 to 2024, the same table on every guide
Loss ratios are published by line of insurance, not by business type. They show how each line has run for insurers as a whole, whatever the business insured.
| Published line | Closest line in this guide | 2020 | 2021 | 2022 | 2023 | 2024 |
|---|---|---|---|---|---|---|
| Fire | Property | 63.2% | 67.3% | 62.4% | 45.5% | 40.9% |
| Commercial multiple peril | Property and liability sold as a package | 61.2% | 60.2% | 59.4% | 61.2% | 54.4% |
| Inland marine | Inland marine and equipment | 64.5% | 49.4% | 47.1% | 44.1% | 44.0% |
| Other liability | Premises liability, and most umbrella, professional (other than medical) and cyber cover | 65.1% | 58.8% | 61.0% | 63.7% | 71.2% |
| Products liability | Products and completed work | 48.2% | 52.2% | 46.0% | 57.5% | 60.3% |
| Workers’ compensation | Workers’ injury | 47.9% | 49.2% | 45.0% | 44.3% | 46.0% |
| Commercial auto liability | Commercial auto | 68.3% | 66.5% | 71.9% | 76.8% | 77.6% |
| Commercial auto physical damage | Commercial auto | 50.9% | 56.3% | 64.3% | 65.1% | 57.9% |
United States. Losses incurred as a percent of direct premiums earned, countrywide, before reinsurance and not including loss adjustment expense. Source: National Association of Insurance Commissioners, Report on Profitability by Line by State in 2024, ten-year summary.
- Installation floater
- Costly or irreplaceable stone delivered to a job is the firm's risk until it is set and accepted.
- Contractors' pollution liability
- Old asbestos flooring and mastic disturbed during tear-out, and mold from leaking showers, fall outside general liability.
- Ocean cargo and transit
- Stone the firm imports directly travels by sea and road at its own risk, and slabs crack in containers.
See this risk on the map.
Book a 30-minute walkthrough tailored to your portfolio and perils of interest.