Electrical contractorsNAICS 238210 · SIC 1731
Electrical contractors wire new buildings and maintain, repair and upgrade power, lighting and control systems in homes, offices and plants. A loose connection or undersized conductor can sit unnoticed behind a wall until it starts a fire, and the people doing the work face shock, arc flash and falls.
NAICS 238210 Electrical Contractors and Other Wiring Installation ContractorsSIC 1731 Electrical Work
Where losses come from.
- 01
Fires traced to faulty connections, overloaded circuits or wrong breakers long after the job
- 02
Electric shock, arc flash burns and falls from ladders and lifts
- 03
Unplanned power loss or equipment damage at a customer's site during live work
- PropertyProperty: Moderate, 2 of 5; sector average 2.2; all business types 2.9.
- Business interruptionBusiness interruption: Moderate, 2 of 5; sector average 1.8; all business types 2.7.
- Premises liabilityPremises liability: Elevated, 3 of 5; sector average 3.5; all business types 2.7.
- Products and completed workProducts and completed work: High, 4 of 5; sector average 3.8; all business types 2.6.
- Workers’ injuryWorkers’ injury: High, 4 of 5; sector average 3.8; all business types 3.0.
- Commercial autoCommercial auto: Elevated, 3 of 5; sector average 3.1; all business types 2.5.
- Crime and theftCrime and theft: Moderate, 2 of 5; sector average 1.7; all business types 2.2.
- Inland marine and equipmentInland marine and equipment: Elevated, 3 of 5; sector average 3.2; all business types 2.6.
- EnvironmentalEnvironmental: Moderate, 2 of 5; sector average 2.5; all business types 2.3.
- Cyber and dataCyber and data: Moderate, 2 of 5; sector average 2.0; all business types 2.7.
- Professional liabilityProfessional liability: Moderate, 2 of 5; sector average 2.3; all business types 2.0.
- Umbrella and excessUmbrella and excess: High, 4 of 5; sector average 4.0; all business types 3.6.
- Vehicle chargers, home batteries, heat pumps and panel upgrades are a growing share of work, adding lithium-ion fire and load calculation exposure to routine residential jobs.
- Data center and battery plant construction brings larger, faster projects with higher fault currents and tight schedules, raising installation values and arc flash severity.
- Licensed electrician shortages push more work onto apprentices and helpers, while smart breakers and thermal cameras give better commissioning records for defending fire claims.
Twelve lines, rated.
Each line shows its rating and the reason for it; open a line for what to watch for and the controls that matter. Ratings are UrbanStat’s own editorial view of a typical business of this type, on a five-step scale. They are a starting point for questions, not a quote, a rate or a statistical measure.
Property
ModerateThe shop is mostly wire, conduit, fittings and fixtures; modest fire load, but copper stock is valuable.
Fire, explosion, water and weather damage to buildings, contents and stock.
- Reels of cable and plastic conduit stacked high in an unsprinklered warehouse
- Lithium-ion tool batteries and energy storage units held in stock
- Battery stock and charging separated from combustibles
- Monitored alarm and sprinkler protection matched to storage height
Business interruption
ModerateCrews work from vans and suppliers deliver direct, though switchgear held for projects has long replacement lead times.
How long and how costly a shutdown is.
- Customer-owned switchgear or generators stored at the shop awaiting installation
- Long-lead equipment shipped straight to site where possible
- Estimating and project files backed up off site
Premises liability
ElevatedWork inside occupied buildings risks fires, shocks to others and outages that stop a customer's production or data systems.
Injuries to customers and the public, on site or caused by operations elsewhere.
- Energized work in hospitals, data centers or process plants
- Trenching and drilling near buried or concealed utilities
- Cable penetrations through fire-rated walls and floors left unsealed
- De-energize and lockout as the default, with written permits for live work
- Outage plans agreed with the customer before switching
- Utility locates and wall scans before digging or drilling
Products and completed work
HighWiring faults cause building fires and electrocutions years after sign-off, and investigators look first at whoever touched the system.
Harm caused by what the business sells, serves, makes, installs or repairs.
- Aluminum or knob-and-tube wiring extended rather than replaced
- Solar, battery storage, generator and vehicle charger installs without specific training
- Fire alarm or life-safety systems installed or maintained
- Permits pulled and inspections passed on every job
- Torque, insulation resistance and thermal imaging checks recorded at commissioning
- Listed components only, with no customer-supplied or salvaged devices
Workers’ injury
HighElectrocution and arc flash can kill, and daily work on ladders, lifts, attics and trenches adds falls and strains.
Injuries and illness to employees.
- Live work treated as routine
- Apprentices working alone or without a licensed supervisor
- Service calls in attics and crawlspaces in extreme heat
- Test-before-touch rule with personal locks and voltage testers for every electrician
- Arc-rated clothing and insulated tools matched to the hazard
- Apprentice ratios kept and documented
Commercial auto
ElevatedService vans loaded with ladders, wire and tools are on the road every day, often on call-outs.
Owned, hired and employee-driven vehicles, deliveries, customers’ vehicles in care.
- Vans taken home and used personally
- Bucket trucks or trailers with cable reels
- Telematics and driver record checks
- Ladder racks and shelving that secure the load
Crime and theft
ModerateCopper wire and cable are stolen from shops, vans and job sites and are easy to sell as scrap.
Burglary, robbery, employee dishonesty, cash, payment and invoice fraud.
- Wire delivered to unsecured sites before rough-in begins
- Scrap copper handled without records
- Wire locked in site containers and issued as needed
- Scrap sales recorded and paid to the company account
Inland marine and equipment
ElevatedTools, test instruments, cable reels and switchgear awaiting installation spread across many job sites.
Property in transit, at job sites or in the insured’s care, and mobile equipment.
- Switchboards, transformers or generators stored on site before the building is weathertight
- Expensive testers and benders left in vans overnight
- Installation cover matched to the largest value on any one site
- Tool inventory with serial numbers and locked van storage
Environmental
ModerateOld ballasts, transformers, lamps and batteries carry oils, mercury and lead that need proper disposal; volumes are small.
Pollution on or from the site or the work.
- Removal of old oil-filled transformers or capacitors
- Drilling or chasing through asbestos-containing walls and panels
- Licensed recycler for lamps, ballasts and batteries
- Asbestos survey checked before work in older buildings
Cyber and data
ModerateEstimating, payroll and scheduling run on cloud apps, and low-voltage crews hold remote logins to customers' building control systems.
Data breaches, ransomware, system outages and attacks on connected equipment.
- Remote access to customers' building automation, access control or camera systems
- Payment changes requested by email from suppliers or general contractors
- Multi-factor login and separate credentials for each customer's control system
- Supplier bank detail changes confirmed by phone before paying
Professional liability
ModerateMost work follows an engineer's drawings, but design-build jobs, load calculations and arc flash studies put the firm's own judgment on record.
Loss or injury caused by advice, design, testing, care or another professional service.
- Design-build work with no licensed engineer reviewing the design
- Arc flash, power quality or load studies sold to owners
- Drawings stamped by an outside engineer who carries professional cover
- Written scope and limits for studies and design work
Umbrella and excess
HighAn electrical fire in an apartment building, hospital or plant can cause deaths and a total loss years after the work.
How likely one liability event is to exhaust primary limits.
- Multifamily, healthcare and data center work
- Owner contracts demanding broad indemnity and high limits
- Contract review limiting indemnity to the firm's own negligence
- Project-specific limits or wrap-up programs on the largest jobs
Construction, occupancy, protection, exposure.
What a risk engineer expects to find at a typical site of this type, and what to compare a submission against.
- Construction
- Usually a leased unit in a light industrial or flex building, with an office, a stockroom of wire, conduit and fixtures, and a fenced yard for vans.
- Occupancy
- Reels of insulated cable, plastic conduit and boxed fixtures, panel and conduit fabrication, and charging racks for lithium-ion tool batteries; switchgear may wait here for installation.
- Protection
- Sprinklers or a monitored alarm matched to rack height, battery charging on a noncombustible surface away from cable stock, and a lit, camera-covered yard.
- Exposure
- Neighboring units share walls and roofs, while the larger exposure sits in customers' buildings, where the firm's wiring stays hidden behind walls for decades.
What to ask and look for.
Start with the desk review before quoting, then walk the site. Tick questions off as you go; ticks are kept in this browser only.
Before quoting: ask the broker or owner
Documents to request
On site: work performed
On site: job sites
On site: people and vehicles
On site: shop and records
Refer or decline if you find
- Work done without permits or final inspection
- Unlicensed staff working unsupervised
- Energized work with no permit system or arc-rated clothing
- Battery storage or solar installs taken on with no training record
- Aluminum branch wiring repaired with unlisted connectors
How UrbanStat data helps.
Copper theft follows the neighborhood, at the shop and at every site. After floods and hurricanes, electricians are called into wet buildings to restore power, where rushed reconnections of soaked equipment become later fire claims.
- Crime scores at the shop and yard address guide theft terms for copper wire, cable reels and vans parked overnight.
- Flood scores at project addresses show where switchgear and panels are being installed at or below likely water levels.
- Parcel and permit data show a building's construction date and electrical permit history, a quick check on the age of wiring being extended.
What the published numbers say.
Official statistics for the industry or property type closest to this business. They describe the industry as a whole, not any one insured.
1.8 recordable injuries and illnesses per 100 full-time workers, below the private-industry average of 2.3.
0.7 of these cases per 100 workers involved days away from work.
United States, 2024. Industry: Electrical contractors and other wiring installation contractors (NAICS 23821), the closest published group. Source: U.S. Bureau of Labor Statistics, Survey of Occupational Injuries and Illnesses, Table 1: incidence rates of nonfatal occupational injuries and illnesses by industry and case types, 2024.
59 fatal work injuries in 2024, most often from falls, slips and trips (17).
Deaths per 100,000 full-time equivalent workers, for the industry sector as a whole.
United States, private industry, 2024. Industry: Electrical Contractors and Other Wiring Installation Contractors (NAICS 23821), the closest published group. Source: U.S. Bureau of Labor Statistics, Census of Fatal Occupational Injuries; sector rates.
1,278 citations from 590 inspections; 54% were classed serious, willful or repeat.
- 1926.501 Duty to have fall protection91
- 1926.405 Wiring methods, components, and equipment for general use67
- 1926.1053 Ladders51
- 1926.416 General requirements (electrical)43
- 1926.403 General requirements (electrical)29
Standards cited most often in this industry, by number of citations.
United States, citations issued October 2024 to September 2025 (federal fiscal year 2025). Industry: Electrical Contractors and Other Wiring Installation Contractors (NAICS 238210). Covers federal and state-plan inspections. A citation is one violation item; one inspection can produce several. Source: U.S. Department of Labor, Occupational Safety and Health Administration, OSHA enforcement data (inspections and violations); standard titles from the Code of Federal Regulations, Title 29 (section headings).
Industry loss ratios by line2020 to 2024, the same table on every guide
Loss ratios are published by line of insurance, not by business type. They show how each line has run for insurers as a whole, whatever the business insured.
| Published line | Closest line in this guide | 2020 | 2021 | 2022 | 2023 | 2024 |
|---|---|---|---|---|---|---|
| Fire | Property | 63.2% | 67.3% | 62.4% | 45.5% | 40.9% |
| Commercial multiple peril | Property and liability sold as a package | 61.2% | 60.2% | 59.4% | 61.2% | 54.4% |
| Inland marine | Inland marine and equipment | 64.5% | 49.4% | 47.1% | 44.1% | 44.0% |
| Other liability | Premises liability, and most umbrella, professional (other than medical) and cyber cover | 65.1% | 58.8% | 61.0% | 63.7% | 71.2% |
| Products liability | Products and completed work | 48.2% | 52.2% | 46.0% | 57.5% | 60.3% |
| Workers’ compensation | Workers’ injury | 47.9% | 49.2% | 45.0% | 44.3% | 46.0% |
| Commercial auto liability | Commercial auto | 68.3% | 66.5% | 71.9% | 76.8% | 77.6% |
| Commercial auto physical damage | Commercial auto | 50.9% | 56.3% | 64.3% | 65.1% | 57.9% |
United States. Losses incurred as a percent of direct premiums earned, countrywide, before reinsurance and not including loss adjustment expense. Source: National Association of Insurance Commissioners, Report on Profitability by Line by State in 2024, ten-year summary.
- Installation floater
- Switchgear, transformers and fixtures waiting on job sites stay at the contractor's risk until the owner accepts the work.
- Contractors' pollution liability
- Asbestos disturbed while chasing walls and oil spilled from old transformers fall under general liability pollution exclusions.
- Care, custody or control
- Damage to the switchgear, panel or equipment being worked on is excluded from general liability, and a failed energization can destroy it.
- Contract surety bonds
- Owners and general contractors require performance and payment bonds on public and larger private work.
See this risk on the map.
Book a 30-minute walkthrough tailored to your portfolio and perils of interest.