Solar panel installersNAICS 238210 · SIC 1731

Solar installers mount photovoltaic panels and solar water heating collectors on roofs and ground racks, wire them through inverters to the grid or plumb them to storage tanks, and increasingly add lithium-ion batteries. Crews work on pitched roofs, and every penetration, connector, battery cabinet and hot-water loop they leave becomes completed-work exposure.

NAICS 238210 Electrical Contractors and Other Wiring Installation ContractorsSIC 1731 Electrical WorkNAICS 237130 Power and Communication Line and Related Structures ConstructionNAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors+3 more codes

Construction · Updated November 2026

01 / Loss drivers

Where losses come from.

  1. 01

    Falls from roofs and ladders while carrying and fixing panels and collectors

  2. 02

    Roof leaks, structural damage and burst solar water loops after installation

  3. 03

    Fires from faulty connectors, wiring or battery storage after the system is energized

How it comparesEach line’s rating against the average for its NAICS sector, Construction (49 business types), and for all 747.
  1. PropertyProperty: Moderate, 2 of 5; sector average 2.2; all business types 2.9.
  2. Business interruptionBusiness interruption: Moderate, 2 of 5; sector average 1.8; all business types 2.7.
  3. Premises liabilityPremises liability: Elevated, 3 of 5; sector average 3.5; all business types 2.7.
  4. Products and completed workProducts and completed work: High, 4 of 5; sector average 3.8; all business types 2.6.
  5. Workers’ injuryWorkers’ injury: High, 4 of 5; sector average 3.8; all business types 3.0.
  6. Commercial autoCommercial auto: Elevated, 3 of 5; sector average 3.1; all business types 2.5.
  7. Crime and theftCrime and theft: Moderate, 2 of 5; sector average 1.7; all business types 2.2.
  8. Inland marine and equipmentInland marine and equipment: Elevated, 3 of 5; sector average 3.2; all business types 2.6.
  9. EnvironmentalEnvironmental: Low, 1 of 5; sector average 2.5; all business types 2.3.
  10. Cyber and dataCyber and data: Elevated, 3 of 5; sector average 2.0; all business types 2.7.
  11. Professional liabilityProfessional liability: Elevated, 3 of 5; sector average 2.3; all business types 2.0.
  12. Umbrella and excessUmbrella and excess: High, 4 of 5; sector average 4.0; all business types 3.6.
What’s changing
  • Battery storage is now sold with many residential systems, bringing lithium-ion fire exposure into garages and homes and raising completed-work severity.
  • Shifting incentives and net metering rules swing demand sharply, pushing installers toward fast growth, heavy subcontracting and sudden contraction that strands warranty obligations.
  • Heat pump water heaters are displacing solar thermal collectors, so fewer firms service older glycol systems, leaving aging collectors and tanks unmaintained on roofs.
02 / Line by line

Twelve lines, rated.

Each line shows its rating and the reason for it; open a line for what to watch for and the controls that matter. Ratings are UrbanStat’s own editorial view of a typical business of this type, on a five-step scale. They are a starting point for questions, not a quote, a rate or a statistical measure.

Property

Moderate
The premises are an office and warehouse holding boxed panels, inverters and racking; battery storage units raise the fire load.

Fire, explosion, water and weather damage to buildings, contents and stock.

Watch for
  • Pallets of lithium-ion battery units stored without separation
  • Damaged or returned batteries kept indoors
  • Glazed collectors and panels stored outdoors where hail can reach them
Controls that matter
  • Battery stock limited, separated and kept under sprinklers
  • Damaged units quarantined outdoors until collected

Business interruption

Moderate
Crews and tools restart quickly, but panel, inverter and battery supply and utility interconnection approvals can stall revenue.

How long and how costly a shutdown is.

Watch for
  • Reliance on one equipment supplier or one financing partner
  • Work pipeline tied to a subsidy or tariff deadline
Controls that matter
  • Approved alternative suppliers for panels and inverters
  • Stock spread between warehouse and job sites

Premises liability

Elevated
Work goes on above occupied homes and businesses: dropped panels, opened roofs caught by rain, and energized wiring during installation.

Injuries to customers and the public, on site or caused by operations elsewhere.

Watch for
  • Roofs opened or drilled with rain forecast
  • Tile, slate or aged roofs walked and drilled
  • Torch soldering of collector piping near roof timbers or insulation
Controls that matter
  • Roof condition and structure assessed before design is accepted
  • Drop zones cordoned below the working area
  • Licensed electricians making all grid and panel connections

Products and completed work

High
Systems sit on roofs for decades; leaking mounts, arcing connectors, overloaded rafters, battery failures and scalding solar water all trace back to the installer.

Harm caused by what the business sells, serves, makes, installs or repairs.

Watch for
  • Mismatched connector types joined in the field
  • Battery storage installed in garages or living spaces
  • Solar water systems with no tempering valve or freeze protection
Controls that matter
  • Flashed mounts fixed into rafters with engineered attachment spacing
  • Rapid shutdown, arc-fault protection and labeling on every system
  • Commissioning tests, thermal scan and hot-water safety checks recorded at handover

Workers’ injury

High
Installers carry panels up ladders onto pitched roofs in heat and wind, and handle circuits that stay live in daylight.

Injuries and illness to employees.

Watch for
  • No anchors or harnesses on residential roofs
  • Panels and collectors carried up ladders by hand
  • Heat stress on dark roofs in summer
Controls that matter
  • Roof anchors and harnesses used on every pitched roof
  • Panel hoists or lifts instead of ladder carries
  • Electrical lockout and covered panels while wiring

Commercial auto

Elevated
Crew trucks and trailers loaded with panels, collectors and ladders travel to a new address most days.

Owned, hired and employee-driven vehicles, deliveries, customers’ vehicles in care.

Watch for
  • Sales and survey staff driving personal vehicles
  • Long ladders and panel pallets poorly secured
Controls that matter
  • Driving record checks and telematics on crew vehicles
  • Racks and tie-downs designed for panels and ladders

Crime and theft

Moderate
Panels, inverters, copper cable and batteries are resaleable and sit in warehouses, trucks and on job sites.

Burglary, robbery, employee dishonesty, cash, payment and invoice fraud.

Watch for
  • Equipment delivered to sites days before installation
  • Ground-mount sites in remote areas
Controls that matter
  • Deliveries timed to installation day
  • Fenced, alarmed warehouse with serialized stock records

Inland marine and equipment

Elevated
Panels, inverters and batteries are at the installer's risk in transit and on site until the system is commissioned.

Property in transit, at job sites or in the insured’s care, and mobile equipment.

Watch for
  • Large commercial or ground-mount projects with stock staged outdoors
  • Hail or wind exposure to panels awaiting commissioning
Controls that matter
  • Installation cover matched to the largest project value
  • Contract terms stating when risk passes to the owner

Environmental

Low
Little pollution exposure; damaged panels, batteries and spent glycol need proper disposal, and ground mounts involve minor earthworks.

Pollution on or from the site or the work.

Watch for
  • Broken modules, spent batteries or used glycol dumped as general waste
Controls that matter
  • Panels, batteries and glycol sent to licensed recyclers or handlers

Cyber and data

Elevated
Installers run monitoring portals with remote control of the inverters they install, and hold homeowners' financing and credit applications.

Data breaches, ransomware, system outages and attacks on connected equipment.

Watch for
  • Shared installer logins to inverter and battery monitoring platforms
  • Credit applications collected on sales staff's own tablets or phones
Controls that matter
  • Multi-factor login and individual accounts on monitoring platforms
  • Financing applications submitted directly in the lender's secure portal

Professional liability

Elevated
Installers design systems, check roof structure and promise energy output and savings; shortfalls and design errors bring financial loss claims.

Loss or injury caused by advice, design, testing, care or another professional service.

Watch for
  • Commissioned sales agents promising bill savings or output figures
  • Structural and wind load checks done in-house without an engineer
Controls that matter
  • Production estimates in writing with stated assumptions and no guarantees
  • Structural review by a licensed engineer for older or heavily loaded roofs

Umbrella and excess

High
A battery or rooftop array fire can destroy a home and kill occupants, and a ground-mount fire can spread as wildfire.

How likely one liability event is to exhaust primary limits.

Watch for
  • Battery storage inside garages attached to homes
  • Commercial rooftops over occupied warehouses, schools or apartments
Controls that matter
  • Battery placement following manufacturer guidance and local fire rules
  • Higher limits or project-specific cover for large commercial and ground-mount jobs
03 / Property picture

Construction, occupancy, protection, exposure.

What a risk engineer expects to find at a typical site of this type, and what to compare a submission against.

Construction
Typically a leased office and warehouse unit in a light industrial park, with racking for boxed panels, inverters and mounting rails, and a yard for trucks and trailers.
Occupancy
Palletized panels in cardboard and foam, lithium-ion battery units awaiting installation, glazed collectors and copper pipe, plus returned or damaged batteries and tool battery charging.
Protection
Sprinklers designed for the storage height, battery stock separated or held in a detached room, damaged units quarantined outdoors, and a monitored alarm with cameras over the yard.
Exposure
Neighbors in shared buildings take smoke and fire from a battery event, and the larger exposure sits on customers' roofs, where systems face weather for decades.
04 / Checklist

What to ask and look for.

Start with the desk review before quoting, then walk the site. Tick questions off as you go; ticks are kept in this browser only.

Before quoting: ask the broker or owner

Documents to request

On site: work performed

On site: on the roof

On site: warehouse and vehicles

On site: handover and records

Refer or decline if you find

  • Crews on pitched roofs without anchors or harnesses
  • No structural or roof-condition check before installation
  • Battery storage installed indoors against manufacturer guidance
  • Electrical or plumbing connections made by unlicensed staff
  • Solar water systems commissioned without a tempering valve
05 / Location

How UrbanStat data helps.

Installed arrays and glazed collectors face hail, wind uplift and wildfire for decades, and those perils test the installer's workmanship. The warehouse's own exposure matters for stored panels and batteries, as does local theft.

HailWindHurricaneWildfireCrime
  • Hail and wind scores at an installation address show how severely mounts, panels and glazed collectors will be tested, before a system design and warranty are accepted.
  • Parcel and permit data give the building's construction date and roofing permit history, a quick check on whether panels are going onto an aging roof.
  • The risk analysis API scores each new installation address in seconds, so hail and wind exposure is known when a rooftop job is booked.
Hail · Wind · Hurricane · Wildfire
06 / Public loss data · NAICS 238210

What the published numbers say.

Official statistics for the industry or property type closest to this business. They describe the industry as a whole, not any one insured.

Workers’ injury frequency

1.8 recordable injuries and illnesses per 100 full-time workers, below the private-industry average of 2.3.

Electrical contractors and other wiring installation contractors
1.8
All private industry
2.3

0.7 of these cases per 100 workers involved days away from work.

United States, 2024. Industry: Electrical contractors and other wiring installation contractors (NAICS 23821), the closest published group. Source: U.S. Bureau of Labor Statistics, Survey of Occupational Injuries and Illnesses, Table 1: incidence rates of nonfatal occupational injuries and illnesses by industry and case types, 2024.

Workplace deaths

59 fatal work injuries in 2024, most often from falls, slips and trips (17).

Construction
9.2
All workers
3.3

Deaths per 100,000 full-time equivalent workers, for the industry sector as a whole.

United States, private industry, 2024. Industry: Electrical Contractors and Other Wiring Installation Contractors (NAICS 23821), the closest published group. Source: U.S. Bureau of Labor Statistics, Census of Fatal Occupational Injuries; sector rates.

Most cited safety standards

1,278 citations from 590 inspections; 54% were classed serious, willful or repeat.

  • 1926.501 Duty to have fall protection
    91
  • 1926.405 Wiring methods, components, and equipment for general use
    67
  • 1926.1053 Ladders
    51
  • 1926.416 General requirements (electrical)
    43
  • 1926.403 General requirements (electrical)
    29

Standards cited most often in this industry, by number of citations.

United States, citations issued October 2024 to September 2025 (federal fiscal year 2025). Industry: Electrical Contractors and Other Wiring Installation Contractors (NAICS 238210). Covers federal and state-plan inspections. A citation is one violation item; one inspection can produce several. Source: U.S. Department of Labor, Occupational Safety and Health Administration, OSHA enforcement data (inspections and violations); standard titles from the Code of Federal Regulations, Title 29 (section headings).

Toxic chemical releases

2 facilities reported toxic chemical releases totaling 108 pounds on and off site.

  • Chromium and chromium compounds
    47
  • Nickel and nickel compounds
    38
  • Manganese and manganese compounds
    21

Chemicals released in the largest amounts, in pounds. 2 of the facilities reported at least one chemical classed as a carcinogen.

United States, 2024. Industry: industry group 2371 (NAICS 2371), the closest published group. Covers facilities in listed industries with ten or more full-time employees that handle listed chemicals above set thresholds. Source: U.S. Environmental Protection Agency, Toxics Release Inventory basic data files.

Industry loss ratios by line2020 to 2024, the same table on every guide

Loss ratios are published by line of insurance, not by business type. They show how each line has run for insurers as a whole, whatever the business insured.

Published lineClosest line in this guide20202021202220232024
FireProperty63.2%67.3%62.4%45.5%40.9%
Commercial multiple perilProperty and liability sold as a package61.2%60.2%59.4%61.2%54.4%
Inland marineInland marine and equipment64.5%49.4%47.1%44.1%44.0%
Other liabilityPremises liability, and most umbrella, professional (other than medical) and cyber cover65.1%58.8%61.0%63.7%71.2%
Products liabilityProducts and completed work48.2%52.2%46.0%57.5%60.3%
Workers’ compensationWorkers’ injury47.9%49.2%45.0%44.3%46.0%
Commercial auto liabilityCommercial auto68.3%66.5%71.9%76.8%77.6%
Commercial auto physical damageCommercial auto50.9%56.3%64.3%65.1%57.9%

United States. Losses incurred as a percent of direct premiums earned, countrywide, before reinsurance and not including loss adjustment expense. Source: National Association of Insurance Commissioners, Report on Profitability by Line by State in 2024, ten-year summary.

Coverages to raise
Builders risk
Large commercial and ground-mount projects need cover for the system under construction until it is commissioned and accepted.
Contractors' pollution liability
Battery fire runoff, glycol spills and disturbed asbestos roofing fall under general liability pollution exclusions.
Product recall
Recalled panels, connectors, inverters or batteries already on many roofs must be traced and swapped, often at the installer's cost.
Hired and non-owned auto
Sales and site survey staff drive their own cars to appointments every day.
Employment practices
Commissioned door-to-door sales teams and seasonal crews bring wage, classification and harassment claims.

NAICS and SIC codes for solar panel installers

SystemCodeIndustry
NAICS 2022, primary238210Electrical Contractors and Other Wiring Installation Contractors
NAICS 2022237130Power and Communication Line and Related Structures Construction
NAICS 2022238220Plumbing, Heating, and Air-Conditioning Contractors
NAICS 2022423720Plumbing and Heating Equipment and Supplies (Hydronics) Merchant Wholesalers
SIC 1987, primary1731Electrical Work
SIC 19871711Plumbing, Heating, and Air-Conditioning
SIC 19871629Heavy Construction, NEC
Next step

See this risk on the map.

Book a 30-minute walkthrough tailored to your portfolio and perils of interest.

Request a Demo →