Carpentry contractorsNAICS 238130 · SIC 1751
Carpentry contractors range from framing crews that stand up a house frame in days and formwork crews on concrete jobs to finish carpenters hanging doors, trim and cabinets in occupied homes. Framing puts crews at height with nailers and saws, and structural or weatherproofing mistakes surface as defect claims years later.
NAICS 238130 Framing ContractorsSIC 1751 Carpentry WorkNAICS 238350 Finish Carpentry ContractorsNAICS 236118 Residential Remodelers+1 more code
Where losses come from.
- 01
Falls from wall plates, joists, trusses and ladders during framing
- 02
Completed-work claims for decks, stairs, framing defects and water intrusion at openings
- 03
Fires and damage in buildings under construction or occupied homes
- PropertyProperty: Moderate, 2 of 5; sector average 2.2; all business types 2.9.
- Business interruptionBusiness interruption: Low, 1 of 5; sector average 1.8; all business types 2.7.
- Premises liabilityPremises liability: Elevated, 3 of 5; sector average 3.5; all business types 2.7.
- Products and completed workProducts and completed work: High, 4 of 5; sector average 3.8; all business types 2.6.
- Workers’ injuryWorkers’ injury: High, 4 of 5; sector average 3.8; all business types 3.0.
- Commercial autoCommercial auto: Elevated, 3 of 5; sector average 3.1; all business types 2.5.
- Crime and theftCrime and theft: Moderate, 2 of 5; sector average 1.7; all business types 2.2.
- Inland marine and equipmentInland marine and equipment: Elevated, 3 of 5; sector average 3.2; all business types 2.6.
- EnvironmentalEnvironmental: Moderate, 2 of 5; sector average 2.5; all business types 2.3.
- Cyber and dataCyber and data: Moderate, 2 of 5; sector average 2.0; all business types 2.7.
- Professional liabilityProfessional liability: Moderate, 2 of 5; sector average 2.3; all business types 2.0.
- Umbrella and excessUmbrella and excess: High, 4 of 5; sector average 4.0; all business types 3.6.
- Prefabricated wall panels, trusses and modular units move framing into factories, cutting time at height but adding crane picks and handling injuries on site.
- Mid-rise wood-frame and mass timber apartments put larger combustible structures on site for longer, raising fire and collapse exposure before sprinklers are live.
- Juries award more in balcony and deck collapse cases, while remodeling of older homes brings lead, asbestos and hidden rot into more jobs.
Twelve lines, rated.
Each line shows its rating and the reason for it; open a line for what to watch for and the controls that matter. Ratings are UrbanStat’s own editorial view of a typical business of this type, on a five-step scale. They are a starting point for questions, not a quote, a rate or a statistical measure.
Property
ModerateMost own little beyond a small shop and lumber store; the combustible structures they build are insured by others during construction.
Fire, explosion, water and weather damage to buildings, contents and stock.
- Shop with fixed saws, dust collection and finishing
- Lumber and sheet goods stored against the building
- Dust and offcuts cleared daily from the shop
- Finishes kept in a flammable liquids cabinet
Business interruption
LowWork resumes with replacement hand and power tools within days; no fixed plant is essential.
How long and how costly a shutdown is.
- Shop-built components that feed several jobs at once
- Tools insured for replacement cost and available from local suppliers
Premises liability
ElevatedCrews work in occupied homes and on busy sites, where dropped lumber, open floor holes and saw sparks injure others or start fires.
Injuries to customers and the public, on site or caused by operations elsewhere.
- Remodeling that opens roofs or walls to the weather
- Temporary heaters and cut-off saws in framed, unsprinklered buildings
- Work subcontracted to uninsured crews
- Floor openings and stairwells guarded as soon as they are framed
- Weather protection planned before any roof or wall is opened
- Certificates of insurance collected from every subcontractor
Products and completed work
HighFraming, decks, stairs and window openings carry structure and keep water out; failures surface years later as costly defect and injury claims.
Harm caused by what the business sells, serves, makes, installs or repairs.
- Elevated decks and balconies, especially on multi-unit housing
- Tract housing or condominium projects with many identical units
- Truss or engineered lumber altered on site
- Deck ledgers, guards and stairs built to stamped details and inspected
- Flashing and sill pans installed at every opening before cladding
- Job files with photos, plans and change orders kept long term
Workers’ injury
HighFramers work at height with pneumatic nailers, circular saws and heavy wall sections; falls and nail-gun punctures are frequent and serious.
Injuries and illness to employees.
- Piece-rate pay that rewards speed over tie-off
- Trusses set by hand without a crane or bracing plan
- Labor classed as independent contractors without their own cover
- Fall protection from the first elevated floor, with guardrails or harnesses
- Sequential-trip nailers and saw guards left in place
- Walls raised with jacks or cranes instead of muscle
Commercial auto
ElevatedPickups and trailers carry crews, lumber and tools to changing job sites every day.
Owned, hired and employee-driven vehicles, deliveries, customers’ vehicles in care.
- Overloaded trailers and long lumber carried without flags or tie-downs
- Young workers driving crew trucks
- Driving records checked for anyone who drives a company vehicle
- Load securement and trailer hitch checks before leaving the yard
Crime and theft
ModeratePower tools, nailers and compressors are stolen from trucks and sites; lumber deliveries vanish from open lots.
Burglary, robbery, employee dishonesty, cash, payment and invoice fraud.
- Tools left overnight in vehicles or unsecured houses
- Locked job boxes, marked tools and deliveries timed to installation
Inland marine and equipment
ElevatedTools travel daily, and lumber, trusses, doors and cabinets sit on site before they are fixed in place.
Property in transit, at job sites or in the insured’s care, and mobile equipment.
- High-value millwork or cabinets stored in unsecured buildings
- Scheduled equipment such as lifts or forklifts taken site to site
- Tool and equipment schedule kept current
- Installation cover for materials until fixed and accepted
Environmental
ModerateRemodeling disturbs lead paint and asbestos in older homes; treated lumber, adhesives and finishes add minor exposure.
Pollution on or from the site or the work.
- Demolition or sanding in houses old enough to contain lead paint
- Lead-safe work practices and testing before cutting into old finishes
Cyber and data
ModeratePlans, schedules and payroll run on phones and cloud apps; a hijacked email account can redirect a builder's progress payment.
Data breaches, ransomware, system outages and attacks on connected equipment.
- Progress payments and supplier bank details changed by email
- Shared logins on scheduling and payroll apps used by crew leads
- Multi-factor login on email, banking and payroll
- Callback checks on any change to payment details
Professional liability
ModerateMost build to others' plans, but design-build remodels and contractor-drawn deck and stair details make the firm answer for design.
Loss or injury caused by advice, design, testing, care or another professional service.
- Remodels designed by the firm without an architect or engineer
- Deck, stair or beam sizes chosen by the crew on site
- Structural details drawn or stamped by an outside engineer
- Written scope that states who is responsible for design
Umbrella and excess
HighA balcony or deck collapse during a gathering, or a fire in a framed building under construction, can injure many people or burn neighbors.
How likely one liability event is to exhaust primary limits.
- Balconies, elevated decks and stairs on multi-unit housing
- Large wood-frame apartment projects before sprinklers are live
- Higher limits or project wrap-ups for multi-unit and balcony work
- Engineered details and inspection sign-off on every elevated deck
Construction, occupancy, protection, exposure.
What a risk engineer expects to find at a typical site of this type, and what to compare a submission against.
- Construction
- Often a small shop in a light industrial unit or a home garage, with a lumber rack, a few fixed saws and parked trailers.
- Occupancy
- Sawing, routing and some finishing create sawdust, offcuts and solvent rags, with compressors and lithium-ion tool batteries charging among stored lumber.
- Protection
- Dust collection emptied to a covered metal bin, finishes in a flammable liquids cabinet, chargers on noncombustible benches, and a monitored alarm with cameras.
- Exposure
- Shared walls in multi-tenant units spread fire both ways; the larger exposure is the wood-frame building under construction and its neighbors on each job.
What to ask and look for.
Start with the desk review before quoting, then walk the site. Tick questions off as you go; ticks are kept in this browser only.
Before quoting: ask the broker or owner
Documents to request
On site: work performed
On site: job sites
On site: tools and vehicles
On site: records and history
Refer or decline if you find
- Framing at height with no fall protection in use
- Balcony or deck work on multi-unit housing without engineered details
- Uninsured subcontract labor doing most of the work
- Contact-trip nailers used for all framing
- Open construction defect litigation
How UrbanStat data helps.
Carpenters work wherever the projects are. Wood frames under construction burn readily in wildland areas and rack in high wind before sheathing; flood-zone remodeling brings wet materials, and tool theft follows high-crime sites.
- Wildfire and wind scores for a project address show how exposed an open wood frame is while materials and work in progress are at risk.
- Parcel and permit data give a building's construction date, a quick screen for lead paint and older framing before remodeling work is quoted.
- Crime scores at the shop and job-site addresses inform theft terms for tools, trailers and delivered lumber.
What the published numbers say.
Official statistics for the industry or property type closest to this business. They describe the industry as a whole, not any one insured.
4.6 recordable injuries and illnesses per 100 full-time workers, above the private-industry average of 2.3.
2.1 of these cases per 100 workers involved days away from work.
United States, 2024. Industry: Framing contractors (NAICS 23813), the closest published group. Source: U.S. Bureau of Labor Statistics, Survey of Occupational Injuries and Illnesses, Table 1: incidence rates of nonfatal occupational injuries and illnesses by industry and case types, 2024.
39 fatal work injuries in 2024, most often from falls, slips and trips (22).
Deaths per 100,000 full-time equivalent workers, for the industry sector as a whole.
United States, private industry, 2024. Industry: Framing Contractors (NAICS 23813), the closest published group. Source: U.S. Bureau of Labor Statistics, Census of Fatal Occupational Injuries; sector rates.
9,884 citations from 3,289 inspections; 82% were classed serious, willful or repeat.
- 1926.501 Duty to have fall protection2,519
- 1926.102 Eye and face protection988
- 1926.1053 Ladders939
- 1926.503 Training requirements (fall protection)917
- 1926.451 General requirements (scaffolds)450
Standards cited most often in this industry, by number of citations.
United States, citations issued October 2024 to September 2025 (federal fiscal year 2025). Industry: Framing Contractors (NAICS 238130). Covers federal and state-plan inspections. A citation is one violation item; one inspection can produce several. Source: U.S. Department of Labor, Occupational Safety and Health Administration, OSHA enforcement data (inspections and violations); standard titles from the Code of Federal Regulations, Title 29 (section headings).
Industry loss ratios by line2020 to 2024, the same table on every guide
Loss ratios are published by line of insurance, not by business type. They show how each line has run for insurers as a whole, whatever the business insured.
| Published line | Closest line in this guide | 2020 | 2021 | 2022 | 2023 | 2024 |
|---|---|---|---|---|---|---|
| Fire | Property | 63.2% | 67.3% | 62.4% | 45.5% | 40.9% |
| Commercial multiple peril | Property and liability sold as a package | 61.2% | 60.2% | 59.4% | 61.2% | 54.4% |
| Inland marine | Inland marine and equipment | 64.5% | 49.4% | 47.1% | 44.1% | 44.0% |
| Other liability | Premises liability, and most umbrella, professional (other than medical) and cyber cover | 65.1% | 58.8% | 61.0% | 63.7% | 71.2% |
| Products liability | Products and completed work | 48.2% | 52.2% | 46.0% | 57.5% | 60.3% |
| Workers’ compensation | Workers’ injury | 47.9% | 49.2% | 45.0% | 44.3% | 46.0% |
| Commercial auto liability | Commercial auto | 68.3% | 66.5% | 71.9% | 76.8% | 77.6% |
| Commercial auto physical damage | Commercial auto | 50.9% | 56.3% | 64.3% | 65.1% | 57.9% |
United States. Losses incurred as a percent of direct premiums earned, countrywide, before reinsurance and not including loss adjustment expense. Source: National Association of Insurance Commissioners, Report on Profitability by Line by State in 2024, ten-year summary.
- Installation floater
- Lumber, trusses, doors and cabinets delivered to site stay at the carpenter's risk until fixed and accepted.
- Builders risk
- Design-build remodels and small new homes often leave the carpenter to insure the open wood frame until completion.
- Hired and non-owned auto
- Crew members often drive their own pickups to job sites and on supply runs.
- Contractors' pollution liability
- Lead dust and asbestos disturbed during remodeling, and mold sealed behind new walls, fall under pollution exclusions.
NAICS and SIC codes for carpentry contractors
See this risk on the map.
Book a 30-minute walkthrough tailored to your portfolio and perils of interest.