Architectural preservationists
Architectural preservationists survey, stabilize and restore historic buildings, combining research and design with hands-on conservation of masonry, timber, plaster and finishes. They work on old, fragile, often occupied structures full of lead paint and dry timber, where one careless heat gun or torch can destroy an irreplaceable building.
Where losses come from.
- 01
Fires started by heat guns, torches or sparks during work on old timber buildings
- 02
Falls from scaffolds, roofs and ladders, and exposure to lead, asbestos and silica
- 03
Damage to historic fabric from wrong materials, harsh cleaning or failed stabilization
- PropertyProperty: Moderate, 2 of 5; sector average 1.6; all business types 2.9.
- Business interruptionBusiness interruption: Low, 1 of 5; sector average 2.0; all business types 2.7.
- Premises liabilityPremises liability: High, 4 of 5; sector average 2.2; all business types 2.7.
- Products and completed workProducts and completed work: Elevated, 3 of 5; sector average 1.7; all business types 2.6.
- Workers’ injuryWorkers’ injury: Elevated, 3 of 5; sector average 2.0; all business types 3.0.
- Commercial autoCommercial auto: Moderate, 2 of 5; sector average 2.1; all business types 2.5.
- Crime and theftCrime and theft: Moderate, 2 of 5; sector average 2.1; all business types 2.2.
- Inland marine and equipmentInland marine and equipment: Elevated, 3 of 5; sector average 2.4; all business types 2.6.
- EnvironmentalEnvironmental: Elevated, 3 of 5; sector average 1.5; all business types 2.3.
- Cyber and dataCyber and data: Moderate, 2 of 5; sector average 3.1; all business types 2.7.
- Professional liabilityProfessional liability: Elevated, 3 of 5; sector average 3.4; all business types 2.0.
- Umbrella and excessUmbrella and excess: High, 4 of 5; sector average 2.8; all business types 3.6.
- Infrared and chemical paint removal is replacing heat guns and torches, cutting fire starts, though chemical strippers raise disposal and runoff questions.
- Laser scanning and drone surveys now record buildings before work starts, giving a clearer baseline when owners later allege damage to historic fabric.
- More historic buildings are being converted to housing and hotels, so preservation work happens beside occupants while sprinklers and modern services are cut into old walls.
Twelve lines, rated.
Each line shows its rating and the reason for it; open a line for what to watch for and the controls that matter. Ratings are UrbanStat’s own editorial view of a typical business of this type, on a five-step scale. They are a starting point for questions, not a quote, a rate or a statistical measure.
Property
ModerateOwn premises are an office and a small workshop holding solvents, strippers, lime, timber and salvaged pieces.
Fire, explosion, water and weather damage to buildings, contents and stock.
- Workshop refinishing with flammable strippers and oily rags
- Salvaged doors, windows and millwork stored in bulk
- Self-closing waste cans emptied daily and flammables in cabinets
- Dust collection and no-smoking rules in the workshop
Business interruption
LowIncome comes from projects at clients' sites, so the firm's own premises are rarely the bottleneck.
How long and how costly a shutdown is.
- A single long project accounting for most of the year's revenue
- Contract terms covering delay and suspension at the client's site
Premises liability
HighWork takes place inside irreplaceable buildings owned by others, often open to visitors, using heat, chemicals and scaffolding.
Injuries to customers and the public, on site or caused by operations elsewhere.
- Paint removal with heat guns or open flame
- Torch-applied roofing, lead welding or soldering on timber roofs
- Museums, churches or homes kept open while work proceeds
- Hot work permit with a fire watch continuing after the shift ends
- Chemical or infrared paint removal in place of open flame
- Work areas fenced off from the public, with protected walkways
Products and completed work
ElevatedHard cement mortars, sealers and abrasive cleaning can damage historic masonry years after the job is finished.
Harm caused by what the business sells, serves, makes, installs or repairs.
- Structural stabilization designed in house without an engineer
- Sandblasting or high-pressure washing of soft brick and stone
- Trial panels approved by the owner before full treatment
- Material choices and methods documented in a conservation record
Workers’ injury
ElevatedCrews work at height on unstable old structures and disturb lead, asbestos, silica and bird droppings.
Injuries and illness to employees.
- Lead paint stripping without blood lead monitoring
- Unsound floors, roofs and parapets used for access
- Engineered scaffolds with tie-ins checked against fragile walls
- Respirators, hygiene facilities and medical surveillance for lead work
Commercial auto
ModerateA few vans and pickups carry tools and salvaged pieces to scattered project sites.
Owned, hired and employee-driven vehicles, deliveries, customers’ vehicles in care.
- Long trips towing trailers of stone, timber or scaffolding
- Load securing checks and driving record reviews
Crime and theft
ModerateLittle cash, but salvaged fittings, copper and lead sheet on open sites and in the workshop draw thieves.
Burglary, robbery, employee dishonesty, cash, payment and invoice fraud.
- Historic fixtures and metals left unsecured on open sites
- Removed items inventoried, photographed and locked away
Inland marine and equipment
ElevatedTools sit on job sites, and clients' windows, doors and ornament travel to the workshop for repair.
Property in transit, at job sites or in the insured’s care, and mobile equipment.
- Irreplaceable stained glass, carvings or fixtures in the firm's custody
- Materials stored on site awaiting installation
- Bailee cover with agreed values for clients' historic elements
- Installation floater and locked site storage
Environmental
ElevatedEvery project disturbs lead paint or asbestos, and chemical strippers and masonry cleaners run off into soil and drains.
Pollution on or from the site or the work.
- Dry scraping or sanding of lead paint without containment
- Acidic or caustic cleaners rinsed straight to the ground
- Containment, vacuum collection and licensed disposal of lead and asbestos waste
- Rinse water captured and neutralized before discharge
Cyber and data
ModerateDrawings, condition surveys and site photographs live in shared cloud folders; ransomware stalls reports and approvals mid-project.
Data breaches, ransomware, system outages and attacks on connected equipment.
- Project records and drawings held only on one office server
- Multi-factor sign-in and off-site backup of project files
Professional liability
ElevatedCondition surveys, treatment specifications and grant or tax-credit paperwork that prove wrong cost owners money and historic fabric.
Loss or injury caused by advice, design, testing, care or another professional service.
- Structural stabilization or shoring designed without a licensed engineer
- Grant or tax-credit applications prepared for owners on tight deadlines
- Treatments specified from photographs without testing the actual material
- Structural work referred to a licensed engineer and recorded in the scope
- Mortar, paint and stone analysis before any treatment is specified
- Written scope separating consulting advice from hands-on work
Umbrella and excess
HighA hot-work fire that destroys a landmark church or museum, or a scaffold collapse onto a street, can exceed primary limits.
How likely one liability event is to exhaust primary limits.
- Landmark, public or high-value buildings kept open to visitors during work
- Hot work on timber roofs only under permit with an extended fire watch
- Scaffold design and tie-ins checked by a competent engineer
Construction, occupancy, protection, exposure.
What a risk engineer expects to find at a typical site of this type, and what to compare a submission against.
- Construction
- The firm's own base is usually an older office with a small workshop, often in a converted mill, barn or storefront with timber floors and roof.
- Occupancy
- The workshop strips and refinishes doors, sash and millwork with solvents, heat and sanding, and holds lime, timber offcuts and salvaged pieces awaiting reuse.
- Protection
- Dust collection, flammable liquid cabinets, self-closing rag cans, monitored smoke detection, and salvaged items stored on racks away from heaters and finishing areas.
- Exposure
- Job sites bring the real exposure: timber-framed landmarks in dense old town centers, with shared walls and occupants or visitors present while work goes on.
What to ask and look for.
Start with the desk review before quoting, then walk the site. Tick questions off as you go; ticks are kept in this browser only.
Before quoting: ask the broker or owner
Documents to request
On site: work performed
On site: job sites
On site: equipment and custody
On site: records and history
Refer or decline if you find
- Open-flame or heat-gun paint stripping on timber buildings
- No fire watch after hot work on roofs
- Lead paint removal without containment or worker monitoring
- Abrasive blasting used on historic brick or stone
- Structural shoring improvised without engineering input
How UrbanStat data helps.
Projects sit in old town centers and waterfront districts, in unreinforced masonry and timber buildings with open roofs. A storm, flood or earthquake mid-project hits a structure at its weakest. Salvaged fittings and roof metals draw thieves.
- Parcel and permit data give a project building's construction date and permit history, a prompt to ask about lead paint, asbestos and earlier alterations before work is priced.
- Earthquake and wind scores at the project address show how exposed an unreinforced or partly dismantled historic structure is while the work is under way.
- Crime scores at the workshop address inform theft terms for salvaged fittings, lead sheet and clients' stained glass held there for repair.
What the published numbers say.
Official statistics for the industry or property type closest to this business. They describe the industry as a whole, not any one insured.
0.3 recordable injuries and illnesses per 100 full-time workers, below the private-industry average of 2.3.
0.2 of these cases per 100 workers involved days away from work.
United States, 2024. Industry: Architectural services (NAICS 54131), the closest published group. Source: U.S. Bureau of Labor Statistics, Survey of Occupational Injuries and Illnesses, Table 1: incidence rates of nonfatal occupational injuries and illnesses by industry and case types, 2024.
20 fatal work injuries in 2024, most often from transportation incidents (11).
United States, private industry, 2024. Industry: Architectural, Engineering, and Related Services (NAICS 5413), the closest published group. Source: U.S. Bureau of Labor Statistics, Census of Fatal Occupational Injuries.
2,879 citations from 1,184 inspections; 58% were classed serious, willful or repeat.
- 1926.501 Duty to have fall protection297
- 1926.451 General requirements (scaffolds)201
- 1926.502 Fall protection systems criteria and practices81
- 1910.1200 Hazard communication81
- 1926.1053 Ladders77
Standards cited most often in this industry, by number of citations.
United States, citations issued October 2024 to September 2025 (federal fiscal year 2025). Industry: Commercial and Institutional Building Construction (NAICS 236220). Covers federal and state-plan inspections. A citation is one violation item; one inspection can produce several. Source: U.S. Department of Labor, Occupational Safety and Health Administration, OSHA enforcement data (inspections and violations); standard titles from the Code of Federal Regulations, Title 29 (section headings).
3,340 fires a year reported in office properties, causing about $112 million in direct property damage a year.
- Cooking equipment29%
- Electrical distribution and lighting equipment12%
- Heating equipment11%
- Intentional10%
Leading causes, share of fires.
United States, 2007 to 2011, annual average. Source: National Fire Protection Association, U.S. Structure Fires in Office Properties.
2 facilities reported toxic chemical releases totaling 14,284 pounds on and off site.
- Ethylene glycol14,284
Chemicals released in the largest amounts, in pounds. 1 of the facilities reported at least one chemical classed as a carcinogen.
United States, 2024. Industry: industry group 5413 (NAICS 5413), the closest published group. Covers facilities in listed industries with ten or more full-time employees that handle listed chemicals above set thresholds. Source: U.S. Environmental Protection Agency, Toxics Release Inventory basic data files.
Industry loss ratios by line2020 to 2024, the same table on every guide
Loss ratios are published by line of insurance, not by business type. They show how each line has run for insurers as a whole, whatever the business insured.
| Published line | Closest line in this guide | 2020 | 2021 | 2022 | 2023 | 2024 |
|---|---|---|---|---|---|---|
| Fire | Property | 63.2% | 67.3% | 62.4% | 45.5% | 40.9% |
| Commercial multiple peril | Property and liability sold as a package | 61.2% | 60.2% | 59.4% | 61.2% | 54.4% |
| Inland marine | Inland marine and equipment | 64.5% | 49.4% | 47.1% | 44.1% | 44.0% |
| Other liability | Premises liability, and most umbrella, professional (other than medical) and cyber cover | 65.1% | 58.8% | 61.0% | 63.7% | 71.2% |
| Products liability | Products and completed work | 48.2% | 52.2% | 46.0% | 57.5% | 60.3% |
| Workers’ compensation | Workers’ injury | 47.9% | 49.2% | 45.0% | 44.3% | 46.0% |
| Commercial auto liability | Commercial auto | 68.3% | 66.5% | 71.9% | 76.8% | 77.6% |
| Commercial auto physical damage | Commercial auto | 50.9% | 56.3% | 64.3% | 65.1% | 57.9% |
United States. Losses incurred as a percent of direct premiums earned, countrywide, before reinsurance and not including loss adjustment expense. Source: National Association of Insurance Commissioners, Report on Profitability by Line by State in 2024, ten-year summary.
- Contractors pollution liability
- Lead paint, asbestos and chemical cleaners disturbed on most jobs fall outside ordinary general liability forms.
- Builders risk or installation floater
- Partly dismantled historic buildings and stored materials need cover during the work, and owners often expect the firm to arrange it.
- Riggers liability
- Lifting bells, statues or stone ornaments for clients puts irreplaceable property at risk while it hangs from the hoist.
| System | Code | Industry |
|---|---|---|
| NAICS 2022, primary | 541310 | Architectural Services |
| NAICS 2022 | 236220 | Commercial and Institutional Building Construction |
| NAICS 2022 | 238140 | Masonry Contractors |
| SIC 1987, primary | 8712 | Architectural Services |
| SIC 1987 | 1542 | General Contractors - Nonresidential Buildings, Other than Industrial Buildings and Warehouses |
| SIC 1987 | 1741 | Masonry, Stone Setting, and Other Stone Work |
See this risk on the map.
Book a 30-minute walkthrough tailored to your portfolio and perils of interest.