Pipeline construction contractors build oil and gas lines end to end: clearing the route, welding and coating pipe, lowering it into trench, drilling under rivers and roads, and pressure testing the result. Crews often work beside operating pipelines in remote country, where line strikes, spills and long crew commutes produce most losses.
Where losses come from.
- 01
Excavators and drilling rigs striking live pipelines, power cables and other buried services on the route
- 02
Crew injuries from pipe handling, sidebooms, trench work, welding and long drives to remote spreads
- 03
Drilling fluid releases, erosion and fuel spills that pollute streams and farmland along the route
- PropertyProperty: Moderate, 2 of 5; sector average 2.2; all business types 2.9.
- Business interruptionBusiness interruption: Moderate, 2 of 5; sector average 1.8; all business types 2.7.
- Premises liabilityPremises liability: Severe, 5 of 5; sector average 3.5; all business types 2.7.
- Products and completed workProducts and completed work: High, 4 of 5; sector average 3.8; all business types 2.6.
- Workers’ injuryWorkers’ injury: High, 4 of 5; sector average 3.8; all business types 3.0.
- Commercial autoCommercial auto: High, 4 of 5; sector average 3.1; all business types 2.5.
- Crime and theftCrime and theft: Moderate, 2 of 5; sector average 1.7; all business types 2.2.
- Inland marine and equipmentInland marine and equipment: High, 4 of 5; sector average 3.2; all business types 2.6.
- EnvironmentalEnvironmental: High, 4 of 5; sector average 2.5; all business types 2.3.
- Cyber and dataCyber and data: Moderate, 2 of 5; sector average 2.0; all business types 2.7.
- Professional liabilityProfessional liability: Moderate, 2 of 5; sector average 2.3; all business types 2.0.
- Umbrella and excessUmbrella and excess: Severe, 5 of 5; sector average 4.0; all business types 3.6.
- More work is replacement and rehabilitation of aging lines in built-up areas, bringing crews closer to homes, traffic and live utilities than greenfield spreads do.
- Longer, deeper horizontal bores under rivers and roads raise the stakes of drilling fluid releases and stuck tooling, and every crossing draws closer scrutiny.
- Lines for carbon dioxide and hydrogen bring new materials and testing demands, while larger jury awards raise the cost of any strike near homes.
Twelve lines, rated.
Each line shows its rating and the reason for it; open a line for what to watch for and the controls that matter. Ratings are UrbanStat’s own editorial view of a typical business of this type, on a five-step scale. They are a starting point for questions, not a quote, a rate or a statistical measure.
Property
ModeratePremises are a yard, shop and pipe storage area; the value sits in mobile equipment and materials out on the spread.
Fire, explosion, water and weather damage to buildings, contents and stock.
- Coating materials, fuel and gas cylinders stored together in the shop
- Separate, ventilated storage for coatings, fuel and cylinders
Business interruption
ModerateA yard loss delays mobilization, but most equipment can be rented and income follows project awards rather than a site.
How long and how costly a shutdown is.
- Specialized drilling rigs or sideboom fleets with long replacement lead times
- Rental agreements and spare parts for critical drilling and welding equipment
Premises liability
SevereDigging and drilling beside live high-pressure lines can rupture them, causing explosions, fires and evacuations, plus damage to farmland and roads.
Injuries to customers and the public, on site or caused by operations elsewhere.
- Work in shared corridors running parallel to operating pipelines
- Horizontal drilling under roads, rivers and other utilities
- Night or winter work where markings are hard to see
- Potholing to expose foreign lines before every crossing or bore
- Owner standby inspectors present whenever work nears live lines
- Locate requests and marked tolerance zones at every crossing
Products and completed work
HighBad welds, poor fusion joints or damaged coating fail once the line is in service, and gas services bored through sewer laterals explode later.
Harm caused by what the business sells, serves, makes, installs or repairs.
- Weld inspection left entirely to the contractor's own staff
- Pipe lowered onto rock with no padding or coating checks
- Gas service bores in neighborhoods with unmapped sewer laterals
- Independent radiographic or ultrasonic testing of welds
- Holiday detection of coating immediately before lowering in
- Sewer laterals camera-inspected after each bore to rule out cross-bores
Workers’ injury
HighCrews handle heavy pipe joints under sidebooms, work in trench and beside welding and grinding, often on long shifts far from help.
Injuries and illness to employees.
- Workers under suspended pipe or guiding it by hand
- Crews near pressurized pipe during hydrostatic tests
- Remote spreads far from medical care
- Exclusion zones under loads and around pressure tests
- Trench protection and a named competent person at every open cut
- A medic and emergency transport plan for each spread
Commercial auto
HighCrews drive long distances to remote spreads after extended shifts, and lowboys and stringing trucks haul equipment and pipe on rural roads.
Owned, hired and employee-driven vehicles, deliveries, customers’ vehicles in care.
- Welders driving their own rigs under contract
- Long commutes on rural roads at the end of long shifts
- Oversize loads of pipe and equipment moved without permits or escorts
- Journey management and fatigue limits for crew travel
- Telematics and driver checks for every vehicle, including welders' rigs
Crime and theft
ModerateFuel, tools, welding machines and equipment are stolen from remote spreads; cash plays little part.
Burglary, robbery, employee dishonesty, cash, payment and invoice fraud.
- Unattended spreads with fuel tanks and equipment parked overnight
- Equipment tracking and night security patrols on the spread
Inland marine and equipment
HighSidebooms, excavators, drilling rigs and welding fleets work on slopes, wetlands and river crossings, and drill tooling can be lost underground.
Property in transit, at job sites or in the insured’s care, and mobile equipment.
- Equipment working in wetlands, floodplains or steep terrain
- Downhole tools and drill pipe left off the schedule
- Equipment schedule including downhole tooling and rented units
- Matting and slope plans for equipment on soft ground
Environmental
HighDrilling fluid surfacing in rivers, silt runoff, fuel spills and test water discharges along the route bring cleanup and fines.
Pollution on or from the site or the work.
- Drilling beneath rivers or wetlands with no fluid release plan
- Refueling equipment close to streams
- Hydrostatic test water discharged untreated
- Fluid release contingency plans with monitoring throughout every bore
- Erosion and sediment controls installed and checked after rain
- Secondary containment and set-back distances for fuel
Cyber and data
ModerateRecords are project plans, payroll and weld logs; invoice fraud and ransomware on project systems are the main threats.
Data breaches, ransomware, system outages and attacks on connected equipment.
- Owner or supplier payment changes requested by email
- Call-back verification before changing payment details
Professional liability
ModerateMost work follows the owner's engineering, but contractor-designed crossings and construction management bring error claims.
Loss or injury caused by advice, design, testing, care or another professional service.
- Bores or crossings designed by the contractor
- Bore plans prepared and sealed by a licensed engineer
Umbrella and excess
SevereA strike on a live transmission line can kill crew and neighbors and burn homes, far exceeding primary limits.
How likely one liability event is to exhaust primary limits.
- Crossings or parallel work on high-pressure lines near homes
- Contracts with broad indemnity in favor of pipeline owners
- Contract review limiting indemnity to the contractor's own negligence
- Approved crossing plans with owner inspectors on site
Construction, occupancy, protection, exposure.
What a risk engineer expects to find at a typical site of this type, and what to compare a submission against.
- Construction
- The insured's own premises are usually a metal shop and a fenced yard with pipe racks, fuel tanks and equipment parking; field offices are trailers on the spread.
- Occupancy
- Shop welding and equipment repair with stored coatings, fuel, lubricants and gas cylinders; on the spread, welding, grinding and coating along open trench.
- Protection
- Fenced, lit yards with cameras, separate storage for flammables and cylinders, extinguishers on every rig, and hot work fire watch along the line.
- Exposure
- Spreads cross farms, forests, rivers and roads beside other pipelines and power lines, and dry vegetation along the route catches welding sparks.
What to ask and look for.
Start with the desk review before quoting, then walk the site. Tick questions off as you go; ticks are kept in this browser only.
Before quoting: ask the broker or owner
Documents to request
On site: work performed
On site: job sites
On site: equipment and crews
On site: records and history
Refer or decline if you find
- Crossing live lines without potholing or owner standby
- Drilling under rivers with no fluid release plan
- Several recent foreign-line strikes with no root cause review
- Contracts with unlimited indemnity to pipeline owners
- Welders driving their own rigs uninsured or unchecked
How UrbanStat data helps.
Open trench and stockpiled pipe flood and float in heavy rain, and cleared slopes along the route slide. Welding sparks start grass fires in dry country, and remote spreads invite theft of equipment and fuel.
- Flood and landslide scores at the yard and at scheduled job site addresses help price work where open trench, pipe and equipment sit on low or steep ground.
- Live wildfire perimeters show which active spreads and laydown yards lie in a fire's path while crews and equipment can still be moved.
- The risk analysis API returns peril scores for the yard and every scheduled site in seconds, so contractor checks run inside the quoting workflow.
What the published numbers say.
Official statistics for the industry or property type closest to this business. They describe the industry as a whole, not any one insured.
0.5 recordable injuries and illnesses per 100 full-time workers, below the private-industry average of 2.3.
0.1 of these cases per 100 workers involved days away from work.
United States, 2024. Industry: Oil and gas pipeline and related structures construction (NAICS 23712), the closest published group. Source: U.S. Bureau of Labor Statistics, Survey of Occupational Injuries and Illnesses, Table 1: incidence rates of nonfatal occupational injuries and illnesses by industry and case types, 2024.
7 fatal work injuries in 2024, most often from exposure to harmful substances or environments (3).
Deaths per 100,000 full-time equivalent workers, for the industry sector as a whole.
United States, private industry, 2024. Industry: Oil and Gas Pipeline and Related Structures Construction (NAICS 23712), the closest published group. Source: U.S. Bureau of Labor Statistics, Census of Fatal Occupational Injuries; sector rates.
95 citations from 34 inspections; 73% were classed serious, willful or repeat.
- 1926.651 Specific excavation requirements20
- 1926.652 Requirements for protective systems8
- 1926.1101 Asbestos8
- 1910.252 General requirements (welding, cutting and brazing)6
- 1926.1153 Respirable crystalline silica5
Standards cited most often in this industry, by number of citations.
United States, citations issued October 2024 to September 2025 (federal fiscal year 2025). Industry: Oil and Gas Pipeline and Related Structures Construction (NAICS 237120). Covers federal and state-plan inspections. A citation is one violation item; one inspection can produce several. Source: U.S. Department of Labor, Occupational Safety and Health Administration, OSHA enforcement data (inspections and violations); standard titles from the Code of Federal Regulations, Title 29 (section headings).
2 facilities reported toxic chemical releases totaling 108 pounds on and off site.
- Chromium and chromium compounds47
- Nickel and nickel compounds38
- Manganese and manganese compounds21
Chemicals released in the largest amounts, in pounds. 2 of the facilities reported at least one chemical classed as a carcinogen.
United States, 2024. Industry: Oil and Gas Pipeline and Related Structures Construction (NAICS 237120). Covers facilities in listed industries with ten or more full-time employees that handle listed chemicals above set thresholds. Source: U.S. Environmental Protection Agency, Toxics Release Inventory basic data files.
Industry loss ratios by line2020 to 2024, the same table on every guide
Loss ratios are published by line of insurance, not by business type. They show how each line has run for insurers as a whole, whatever the business insured.
| Published line | Closest line in this guide | 2020 | 2021 | 2022 | 2023 | 2024 |
|---|---|---|---|---|---|---|
| Fire | Property | 63.2% | 67.3% | 62.4% | 45.5% | 40.9% |
| Commercial multiple peril | Property and liability sold as a package | 61.2% | 60.2% | 59.4% | 61.2% | 54.4% |
| Inland marine | Inland marine and equipment | 64.5% | 49.4% | 47.1% | 44.1% | 44.0% |
| Other liability | Premises liability, and most umbrella, professional (other than medical) and cyber cover | 65.1% | 58.8% | 61.0% | 63.7% | 71.2% |
| Products liability | Products and completed work | 48.2% | 52.2% | 46.0% | 57.5% | 60.3% |
| Workers’ compensation | Workers’ injury | 47.9% | 49.2% | 45.0% | 44.3% | 46.0% |
| Commercial auto liability | Commercial auto | 68.3% | 66.5% | 71.9% | 76.8% | 77.6% |
| Commercial auto physical damage | Commercial auto | 50.9% | 56.3% | 64.3% | 65.1% | 57.9% |
United States. Losses incurred as a percent of direct premiums earned, countrywide, before reinsurance and not including loss adjustment expense. Source: National Association of Insurance Commissioners, Report on Profitability by Line by State in 2024, ten-year summary.
- Contractors pollution liability
- Fluid releases, fuel spills and silt runoff fall outside standard general liability pollution terms.
- Builders risk and installation floater
- Pipe in the ground before acceptance can be lost to flood, washout or a failed pressure test.
- Rented and leased equipment
- Drilling rigs, sidebooms and mats are often rented, and contracts make the contractor answer for loss.
- Explosion, collapse and underground
- Some general liability forms restrict damage to underground property, the core hazard of strikes on live lines.
- Railroad protective liability
- Bores and crossings under railroad tracks need a separate policy naming the railroad before work can start.
See this risk on the map.
Book a 30-minute walkthrough tailored to your portfolio and perils of interest.