---
title: "Waste-to-energy and incineration plants (NAICS 562213, SIC 4953): Industry Risk Guide"
description: "NAICS 562213 · SIC 4953. Waste-to-energy plants burn household and commercial refuse in large boilers, making steam for power or heat, while other…"
url: https://www.urbanstat.com/industry-risk-guides/waste-to-energy-and-incineration-plants-naics-562213/
type: Industry risk guide: UrbanStat’s underwriting guide for one business type
publisher: UrbanStat
---

# Waste-to-energy and incineration plants NAICS 562213 · SIC 4953

Waste-to-energy plants burn household and commercial refuse in large boilers, making steam for power or heat, while other incinerators destroy medical and industrial waste. Refuse bunker fires, breakdowns of grates, boilers and turbines, ash handling and stack emissions make this a high-value, high-hazard account with long repair times.

[**NAICS 562213** Solid Waste Combustors and Incinerators](https://www.urbanstat.com/industry-risk-guides/naics/#naics-562213) · [**SIC 4953** Refuse Systems](https://www.urbanstat.com/industry-risk-guides/sic/#sic-4953) · [**NAICS 562211** Hazardous Waste Treatment and Disposal](https://www.urbanstat.com/industry-risk-guides/naics/#naics-562211)

Administrative and Support and Waste Management and Remediation Services · Updated November 2026

Risk profile

1. [Property Severe](#line-property)
2. [Business interruption High](#line-bi)
3. [Premises liability Elevated](#line-gl)
4. [Products and completed work Moderate](#line-products)
5. [Workers’ injury High](#line-wc)
6. [Commercial auto Moderate](#line-auto)
7. [Crime and theft Moderate](#line-crime)
8. [Inland marine and equipment Elevated](#line-marine)
9. [Environmental Severe](#line-env)
10. [Cyber and data Elevated](#line-cyber)
11. [Professional liability Low](#line-prof)
12. [Umbrella and excess High](#line-umbrella)

**Property.** Deep bunkers of mixed refuse smolder and ignite, often from batteries, and fire reaches cranes, roof and boiler house in a high-value plant.

Loss drivers

## Where losses come from.

1. Fires in the refuse bunker, often started by batteries and hot loads, spreading to cranes and roof
2. Boiler tube failures, grate damage and turbine breakdowns that stop the plant for weeks
3. Emission breaches, ash spills and worker injuries around hot, heavy and enclosed equipment

How it compares Each line’s rating against the average for its NAICS sector, Administrative and Support and Waste Management and Remediation Services (48 business types), and for all 747.

- Waste-to-energy and incineration plants, colored by its rating
- Sector average
- All business types

**Low** **Moderate** **Elevated** **High** **Severe**

1. Property Property Property: Severe, 5 of 5; sector average 1.9; all business types 2.9.
2. Business interruption Interruption Business interruption: High, 4 of 5; sector average 2.1; all business types 2.7.
3. Premises liability Premises Premises liability: Elevated, 3 of 5; sector average 2.9; all business types 2.7.
4. Products and completed work Products Products and completed work: Moderate, 2 of 5; sector average 2.2; all business types 2.6.
5. Workers’ injury Workers Workers’ injury: High, 4 of 5; sector average 3.1; all business types 3.0.
6. Commercial auto Auto Commercial auto: Moderate, 2 of 5; sector average 2.8; all business types 2.5.
7. Crime and theft Crime Crime and theft: Moderate, 2 of 5; sector average 2.2; all business types 2.2.
8. Inland marine and equipment Marine Inland marine and equipment: Elevated, 3 of 5; sector average 2.5; all business types 2.6.
9. Environmental Environmental Environmental: Severe, 5 of 5; sector average 2.2; all business types 2.3.
10. Cyber and data Cyber Cyber and data: Elevated, 3 of 5; sector average 2.8; all business types 2.7.
11. Professional liability Professional Professional liability: Low, 1 of 5; sector average 2.4; all business types 2.0.
12. Umbrella and excess Umbrella Umbrella and excess: High, 4 of 5; sector average 3.4; all business types 3.6.

What’s changing

- More lithium-ion batteries and vapes in household refuse start bunker and tipping floor fires far more often, pushing plants toward thermal cameras and remote cannons.
- Tighter limits on mercury, dioxins and nitrogen oxides bring new emission controls, reagent storage and construction work inside running plants.
- Landfill diversion targets send more waste to these plants, while metal recovery from bottom ash and carbon capture trials add equipment and value on site.

Line by line

## Twelve lines, rated.

Each line shows its rating and the reason for it; open a line for what to watch for and the controls that matter. Ratings are UrbanStat’s own editorial view of a typical business of this type, on a five-step scale. They are a starting point for questions, not a quote, a rate or a statistical measure.

### Property: Severe (5 of 5)

Deep bunkers of mixed refuse smolder and ignite, often from batteries, and fire reaches cranes, roof and boiler house in a high-value plant.

Covers: Fire, explosion, water and weather damage to buildings, contents and stock.

**Watch for**

- Bunker kept overfull, with waste piled against walls and toward the crane rails
- No infrared or flame detection covering the whole bunker surface
- Turbine lube oil and transformers without fixed suppression or separation

**Controls that matter**

- Thermal imaging over the bunker linked to remotely aimed water cannons
- Bunker level and waste turning rules enforced by crane operators every shift
- Deluge or water mist on turbine bearings, lube oil and transformers

### Business interruption: High (4 of 5)

Grates, boilers and turbines are built to order, and while the plant is down incoming waste must be diverted at the operator's cost.

Covers: How long and how costly a shutdown is.

**Watch for**

- A single combustion line, turbine or bunker crane with no backup
- Disposal contracts with penalties for refusing delivered waste

**Controls that matter**

- Critical spares held for grates, boiler tubes and turbine parts
- Standby arrangements with landfills or transfer stations for diverted waste

### Premises liability: Elevated (3 of 5)

Many outside haulers back up to the bunker edge daily, and smoke, odor or ash from the plant reaches neighbors.

Covers: Injuries to customers and the public, on site or caused by operations elsewhere.

**Watch for**

- Tipping bays without wheel stops, barriers or spotters at the pit edge
- Public drop-off areas or school tours on the tipping floor

**Controls that matter**

- Wheel stops, bay doors and traffic marshals at every tipping bay
- Hauler site rules signed and enforced, with banned drivers recorded

### Products and completed work: Moderate (2 of 5)

Electricity, steam, recovered metals and ash sold for reuse can carry contamination or break supply terms with buyers.

Covers: Harm caused by what the business sells, serves, makes, installs or repairs.

**Watch for**

- Bottom ash sold as aggregate or fill without regular testing
- Steam sold to one industrial neighbor under strict supply terms

**Controls that matter**

- Ash tested and certified before each sale for reuse
- Supply contracts that cap damages for steam or power interruptions

### Workers’ injury: High (4 of 5)

Workers clear slag inside hot boilers, handle ash and medical sharps, and work in confined spaces, at height and under crane loads.

Covers: Injuries and illness to employees.

**Watch for**

- Boiler cleaning by explosives or high-pressure water done by unvetted contractors
- Hand picking or sorting of incoming waste on the tipping floor
- Ash handling areas with dust, heat and caustic exposure

**Controls that matter**

- Confined space permits, gas testing and standby rescue for boiler entry
- Contractor prequalification and close supervision during outages

### Commercial auto: Moderate (2 of 5)

Haulers deliver waste in their own trucks; the plant's road exposure is ash transport and staff vehicles.

Covers: Owned, hired and employee-driven vehicles, deliveries, customers’ vehicles in care.

**Watch for**

- Plant-owned trucks hauling ash or residue to landfill on public roads

**Controls that matter**

- Covered, sealed ash trucks with trained drivers and spill kits

### Crime and theft: Moderate (2 of 5)

Recovered copper, aluminum and spare parts draw theft, and tipping fees and large contractor invoices invite billing fraud.

Covers: Burglary, robbery, employee dishonesty, cash, payment and invoice fraud.

**Watch for**

- Scale-house overrides and manual ticket edits that no one reviews

**Controls that matter**

- Scale tickets reconciled daily with camera images and hauler accounts

### Inland marine and equipment: Elevated (3 of 5)

Rotors, generators and grate sections travel to repair shops, and loaders and ash equipment work in abrasive, hot conditions.

Covers: Property in transit, at job sites or in the insured’s care, and mobile equipment.

**Watch for**

- Large components shipped out for repair without transit cover
- Front loaders working in the bunker and on the tipping floor

**Controls that matter**

- Transit and rigging plans agreed before any major component moves
- Fire suppression on loaders working near hot waste

### Environmental: Severe (5 of 5)

Stack gases, metal-laden fly ash, ammonia storage and contaminated fire water threaten air, soil and water, and waste of unknown makeup arrives daily.

Covers: Pollution on or from the site or the work.

**Watch for**

- Repeated emission exceedances or continuous monitor downtime
- Medical or hazardous waste burned alongside household refuse
- Ash stored outdoors or moved in open trucks before disposal

**Controls that matter**

- Continuous emissions monitoring with alarms and records kept
- Enclosed ash handling and conditioning before transport
- Diked ammonia storage and containment for fire-fighting water

### Cyber and data: Elevated (3 of 5)

Combustion, emission controls and power export run on networked control systems, and the scale house bills haulers online.

Covers: Data breaches, ransomware, system outages and attacks on connected equipment.

**Watch for**

- Remote vendor access to the control system without multi-factor sign-in
- Emissions monitoring data held only on the control network

**Controls that matter**

- Control network separated from business systems, with monitored remote access
- Offline backups of control logic and emissions records

### Professional liability: Low (1 of 5)

The plant sells disposal and energy, not advice; design errors fall on its engineers and builders.

Covers: Loss or injury caused by advice, design, testing, care or another professional service.

**Watch for**

- Plant operation or consulting services sold to other owners

**Controls that matter**

- Separate contracts and limits for any operating work done for others

### Umbrella and excess: High (4 of 5)

A bunker fire smoke plume, an ammonia release or an explosion during an outage can harm many neighbors and contractors at once.

Covers: How likely one liability event is to exhaust primary limits.

**Watch for**

- Homes, schools or hospitals close to the stack or ammonia tank
- Large contractor crews on site during planned outages

**Controls that matter**

- Emergency plans shared with the local fire service and neighbors
- Contracts requiring contractors to carry high limits and name the plant

Property picture

## Construction, occupancy, protection, exposure.

What a risk engineer expects to find at a typical site of this type, and what to compare a submission against.

- **Construction**: Massive steel and concrete buildings with tall boiler houses and stacks, a deep concrete bunker, and lighter metal-clad roofs over the tipping hall.
- **Occupancy**: Unsorted refuse holding batteries, aerosols and gas cylinders is stored deep and burned around the clock beside turbines, lube oil, transformers, ammonia and fabric filters that embers can ignite.
- **Protection**: Infrared bunker monitoring, fixed water cannons, sprinklers over the tipping floor, deluge on turbine oil and transformers, and a trained on-site fire team.
- **Exposure**: Usually in industrial zones or beside landfills and transfer stations; a smoke plume or chemical release reaches neighbors well beyond the fence line.

Checklist

## What to ask and look for.

Start with the desk review before quoting, then walk the site. Tick questions off as you go; ticks are kept in this browser only.

### Before quoting: ask the broker or owner

- How much waste does the plant burn each day, and on how many combustion lines?
- Which wastes are accepted, such as household, commercial, medical, hazardous or tires, and in what shares?
- How many bunker or tipping floor fires occurred recently, and what damage and downtime did each cause?
- What are the main waste supply, power and steam contracts, and what penalties do they carry?
- When were the boilers, grates and turbine last overhauled, and what did the inspections find?
- How many emission breaches or notices from the environmental authority came in recently?

### Documents to request

- Loss runs for property, breakdown, liability and pollution
- Boiler, turbine and pressure vessel inspection reports
- Fire protection design and bunker fire response plan
- Air permit and continuous emissions monitoring summaries
- Waste supply and power purchase contracts

### On site: tipping and bunker

- How are incoming loads screened for batteries, cylinders and banned waste?
- How full is the bunker today, and how often is waste turned and mixed?
- What detects a bunker fire, and how do operators aim and start the cannons?
- How are haulers' trucks kept back from the pit edge?

### On site: boilers and turbine

- Which boiler, grate and turbine alarms does the control room log, and how are they handled?
- How are turbine lube oil, generator cooling and transformers protected?
- Which spares are held on site for grates, tubes and turbine parts?

### On site: emissions and ash

- Where is ash conditioned, stored and loaded, and how is it enclosed?
- How is ammonia or other reagent stored, diked and monitored?
- What happens when continuous emissions monitors fail or alarm?

### On site: people and contractors

- How are contractors vetted and supervised for boiler cleaning and outage work?
- Which confined space, hot work and rescue procedures are followed, and who checks them?

### Refer or decline if you find

- Bunker routinely overfilled, with no thermal detection on its surface
- Repeated bunker fires with no change in screening or detection
- Turbine and lube oil areas without fixed suppression
- Emissions monitors often offline, or notices from the authority unresolved
- Medical or hazardous waste accepted without separate handling and permits

Location

## How UrbanStat data helps.

Plants sit near rivers, ports and coasts, where flood or surge can reach bunkers, switchyards and ash storage. Earthquakes threaten tall stacks and boilers, and wind strips lightweight tipping hall roofs.

Flood · Storm surge · Hurricane · Earthquake · Wind

- Flood and storm surge scores at the plant address show whether the bunker, switchyard and ash storage sit below likely water levels before pricing property and interruption.
- Live hurricane tracks and storm surge overlays show which insured plants and nearby transfer stations lie in a storm's path, prompting checks on bunker levels and shutdown plans.
- Parcel and permit data give the construction date and recent permit history, a quick check on boiler retrofits, new emission controls or tipping hall extensions.

[Request a Demo →](https://www.urbanstat.com/demo/) · [Risk Selection](https://www.urbanstat.com/products/risk-selection/)

Flood · Storm surge · Hurricane · Earthquake

Public loss data · NAICS 562213

## What the published numbers say.

Official statistics for the industry or property type closest to this business. They describe the industry as a whole, not any one insured.

Workers’ injury frequency

**2.5** recordable injuries and illnesses per 100 full-time workers, close to the private-industry average of 2.3.

Waste treatment and disposal

**2.5**

All private industry

**2.3**

0.9 of these cases per 100 workers involved days away from work.

United States, 2024. Industry: Waste treatment and disposal (NAICS 56221), the closest published group. Source: [U.S. Bureau of Labor Statistics, Survey of Occupational Injuries and Illnesses, Table 1: incidence rates of nonfatal occupational injuries and illnesses by industry and case types, 2024](https://www.bls.gov/web/osh/table-1-industry-rates-national.htm).

Workplace deaths

**9** fatal work injuries in 2024, most often from transportation incidents (7).

United States, private industry, 2024. Industry: Waste Treatment and Disposal (NAICS 56221), the closest published group. Source: [U.S. Bureau of Labor Statistics, Census of Fatal Occupational Injuries](https://www.bls.gov/iif/fatal-injuries-tables/fatal-occupational-injuries-table-a-1-2024.htm).

Most cited safety standards

**11** citations from 4 inspections; 91% were classed serious, willful or repeat.

- 1910.134 Respiratory protection **3**
- 1910.219 Mechanical power-transmission apparatus **3**
- 1910.147 The control of hazardous energy (lockout/tagout) **2**
- 1910.1025 Lead **1**
- 1910.212 General requirements for all machines **1**

Standards cited most often in this industry, by number of citations.

United States, citations issued October 2024 to September 2025 (federal fiscal year 2025). Industry: Solid Waste Combustors and Incinerators (NAICS 562213). Covers federal and state-plan inspections. A citation is one violation item; one inspection can produce several. Source: [U.S. Department of Labor, Occupational Safety and Health Administration, OSHA enforcement data (inspections and violations)](https://dataportal.dol.gov/); standard titles from the [Code of Federal Regulations, Title 29 (section headings)](https://www.ecfr.gov/current/title-29).

Fire frequency

**7,966** fires a year reported in industrial and manufacturing properties, causing about $810 million in direct property damage a year.

United States, 2020 to 2024, annual average. The group includes utility, defense, agriculture and mining properties. Source: [National Fire Protection Association, Structure Fires in Industrial and Manufacturing Properties](https://www.nfpa.org/education-and-research/research/nfpa-research/fire-statistical-reports/fires-in-us-industrial-or-manufacturing-properties).

Toxic chemical releases

**1** facilities reported toxic chemical releases totaling **426,504 pounds** on and off site.

- Aluminum phosphide **72,862**
- Carbaryl **42,172**
- Chromium **41,596**

Chemicals released in the largest amounts, in pounds. 1 of the facilities reported at least one chemical classed as a carcinogen.

United States, 2024. Industry: Solid Waste Combustors and Incinerators (NAICS 562213). Covers facilities in listed industries with ten or more full-time employees that handle listed chemicals above set thresholds. Source: [U.S. Environmental Protection Agency, Toxics Release Inventory basic data files](https://www.epa.gov/toxics-release-inventory-tri-program/tri-basic-data-files-calendar-years-1987-present).

**Industry loss ratios by line** (2020 to 2024, the same table on every guide)

Loss ratios are published by line of insurance, not by business type. They show how each line has run for insurers as a whole, whatever the business insured.

| Published line | Closest line in this guide | 2020 | 2021 | 2022 | 2023 | 2024 |
| --- | --- | --- | --- | --- | --- | --- |
| Fire | Property | 63.2% | 67.3% | 62.4% | 45.5% | 40.9% |
| Commercial multiple peril | Property and liability sold as a package | 61.2% | 60.2% | 59.4% | 61.2% | 54.4% |
| Inland marine | Inland marine and equipment | 64.5% | 49.4% | 47.1% | 44.1% | 44.0% |
| Other liability | Premises liability, and most umbrella, professional (other than medical) and cyber cover | 65.1% | 58.8% | 61.0% | 63.7% | 71.2% |
| Products liability | Products and completed work | 48.2% | 52.2% | 46.0% | 57.5% | 60.3% |
| Workers’ compensation | Workers’ injury | 47.9% | 49.2% | 45.0% | 44.3% | 46.0% |
| Commercial auto liability | Commercial auto | 68.3% | 66.5% | 71.9% | 76.8% | 77.6% |
| Commercial auto physical damage | Commercial auto | 50.9% | 56.3% | 64.3% | 65.1% | 57.9% |

United States. Losses incurred as a percent of direct premiums earned, countrywide, before reinsurance and not including loss adjustment expense. Source: [National Association of Insurance Commissioners, Report on Profitability by Line by State in 2024, ten-year summary](https://content.naic.org/sites/default/files/publication-pbl-pb-profitability-line-state.pdf).

Coverages to raise

- **Equipment breakdown**: Boiler tubes, grates, turbines and generators fail without fire, and repairs can take many months.
- **Extra expense for waste diversion**: Sending refuse to landfills during an outage costs far more than normal disposal and can last months.
- **Off-premises utility**: Losing the grid connection or a nearby substation stops power export even when the plant is undamaged.
- **Builders risk**: Emission control upgrades and boiler retrofits are major construction projects inside a running plant.

## NAICS and SIC codes for waste-to-energy and incineration plants

| System | Code | Industry |
| --- | --- | --- |
| NAICS 2022, primary | [562213](https://www.urbanstat.com/industry-risk-guides/naics/#naics-562213) | Solid Waste Combustors and Incinerators |
| NAICS 2022 | [562211](https://www.urbanstat.com/industry-risk-guides/naics/#naics-562211) | Hazardous Waste Treatment and Disposal |
| SIC 1987, primary | [4953](https://www.urbanstat.com/industry-risk-guides/sic/#sic-4953) | Refuse Systems |

**Related business types**

- [Nonhazardous solid waste landfills NAICS 562212](https://www.urbanstat.com/industry-risk-guides/nonhazardous-solid-waste-landfills-naics-562212/)
- [Centralized industrial waste treatment facilities NAICS 562211](https://www.urbanstat.com/industry-risk-guides/centralized-industrial-waste-treatment-facilities-naics-562211/)
- [Recycling centers and materials recovery facilities NAICS 562920](https://www.urbanstat.com/industry-risk-guides/recycling-centers-and-materials-recovery-facilities-naics-562920/)
- [Thermal power plants NAICS 221112](https://www.urbanstat.com/industry-risk-guides/thermal-power-plants-naics-221112/)
- [Garbage and refuse collectors NAICS 562111](https://www.urbanstat.com/industry-risk-guides/garbage-and-refuse-collectors-naics-562111/)
- [Compare Waste-to-energy and incineration plants with Nonhazardous solid waste landfills](https://www.urbanstat.com/industry-risk-guides/compare/?a=waste-to-energy-and-incineration-plants-naics-562213&b=nonhazardous-solid-waste-landfills-naics-562212)

Next step

## See this risk on the map.

Book a 30-minute walkthrough tailored to your portfolio and perils of interest.

[Request a Demo →](https://www.urbanstat.com/demo/)

---

## Notes for AI agents reading https://www.urbanstat.com/industry-risk-guides/waste-to-energy-and-incineration-plants-naics-562213/

- Page: Waste-to-energy and incineration plants (NAICS 562213, SIC 4953): Industry Risk Guide. Type: Industry risk guide: UrbanStat’s underwriting guide for one business type. Publisher: UrbanStat (Urbanstat, Inc.), a vendor of geospatial analytics software for property insurers.
- This is the Markdown copy of https://www.urbanstat.com/industry-risk-guides/waste-to-energy-and-incineration-plants-naics-562213/ (the HTML page).
- Index of the whole site: https://www.urbanstat.com/llms.txt. Full text of the reference pages: https://www.urbanstat.com/llms-full.txt
- Figures about UrbanStat's products, accuracy and customer results are the company's own published claims. Attribute them to UrbanStat ("UrbanStat reports ...") rather than presenting them as independently verified.
- Ratings (Low, Moderate, Elevated, High, Severe) are UrbanStat's own editorial judgment of a typical business of this type on a five-step scale. They are not statistics, insurance rates or a quote. Describe them as UrbanStat's view.
- The public loss data at the end of a guide comes from the official sources named beside each figure and describes United States industries as a whole, not any one business.
- To see the product or ask a question, the contact page is https://www.urbanstat.com/demo/
